My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSOMAS (2)-A-2020-075-03
Clerk
>
Contracts / Agreements
>
P
>
PSOMAS (2)-A-2020-075-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 8:21:48 AM
Creation date
5/6/2020 4:32:18 PM
Metadata
Fields
Template:
Contracts
Company Name
PSOMAS
Contract #
A-2020-075-03
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
10/15/2024
Destruction Year
2024
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of overflow pipeline, drain pipeline and sluice <br />gates. Psomas' scope of services includes <br />preliminary and final design; construction <br />plans, specifications, and estimates of probable <br />construction costs; and engineering support <br />during construction. <br />Pelican Hill Golf Club <br />Sewer Pipeline Rehabilitation <br />Newport Beach, CA <br />CLIENT CONTACT: Irvine Ranch Water District <br />15600 Sand Canyon Avenue, Irvine, CA 92618 <br />Christian Kessler, PE, Engineer <br />(949) 543-5441 <br />YEAR COMPLETED: Ongoing <br />KEY PERSONNEL: Maira Salcedo I Michael Swan <br />Benjamin Halbach I Joseph Barrera <br />Irvine Ranch Water District (IRWD) owns and <br />maintains four sewer pipelines that convey flows <br />through the Pelican Hill Golf Club and Pelican Hill <br />Community Association. The four sewer pipelines <br />were constructed in the early 1990s with a mix <br />of polyvinyl chloride (PVC) and ductile iron <br />pipe (DIP) ranging from 8-inch through 12-inch <br />diameter. As part of IRWD's routine CCTV <br />inspection, portions of these areas were found to <br />be experiencing material pitting, and deformation <br />and/or liner failure at various locations. <br />In May 2019, IRWD hired Psomas to evaluate <br />the existing conditions of 6,027 LF of sewer pipe <br />and provide professional design services for <br />the four sewer pipelines. Our NASSCO certified <br />engineers evaluated the CCTV reports and <br />videos. We found the majority of the pipelines <br />were in good overall condition. The final design <br />plans completed in November 2019 resulted <br />in 2,420 LF of lining, 5 LF of root removal, and <br />35 LF of calcium deposit removal. <br />Psomas will also be providing Construction <br />Phase Services including, but not limited to, <br />active participation in construction meetings, <br />review and response to shop drawings and <br />contractor request for information, site visits, and <br />record drawing preparation. <br />F. REFERENCES <br />1. City of El Monte <br />Water Main Replacement <br />Leticia Ortiz, Senior Public Works Engineer <br />(626) 580-2022 <br />A description for this project is on Page 8 <br />2. City of Hermosa Beach <br />On -Call Design Services for CIP Sewer <br />Improvements for Various Locations <br />Lucho Rodriguez, PE, Deputy City Engineer <br />(310) 318-0210 <br />A description for this project is on Page 9 <br />3. Rossmoor/Los Alamitos Area <br />Sewer District <br />Sewer Rehabilitation <br />Susan Bell, General Manager <br />(562)431-2223 <br />A description for this project is on Page 10 <br />PSOMAS PUP N1 1a 110 City ofSanta A,a <br />
The URL can be used to link to this page
Your browser does not support the video tag.