Laserfiche WebLink
Deliverables: Final utility research <br />correspondence and plans, 50% PS&E submittal. <br />Final Design <br />10. Coordinate work with City and impacted <br />agencies prior to securing approval to <br />proceed with final design. <br />11. Prepare 90% PS&E submittal including a <br />project description and forms suitable for <br />City staffs use in preparing environmental <br />documentation for the project. <br />12. Prepare 100% PS&E submittal based on <br />comments from 90% submittal review and <br />other requirements. <br />13. Prepare agenda for, attend and prepare <br />minutes for monthly meetings with City staff <br />during the design phase to review project <br />issues and status reports and monitor <br />schedule progress. <br />Deliverables: 90% PS&E submittal with return <br />of 50% City redlines and comments; 100% <br />PS&E submittal with return of 90% City redlines <br />and comments; Final PS&E submittal (ready for <br />printing/bidding) with 100% City redlines and <br />comments, meeting agenda and minutes. <br />Bid/Award and Construction <br />Support Services <br />14. Provide support services during bid/award <br />phase to answer contractor questions and <br />plan clarifications and prepare addenda <br />for revisions, if necessary. Assist City staff <br />in bid analysis and preparation of award <br />documents. <br />15. Provide engineering support services during <br />construction to attend pre -construction <br />meeting, respond to RFls, review submittals, <br />observe construction, make potential plan <br />revisions to address unforeseen conditions, <br />and prepare record drawings. <br />Deliverables: Addenda, if required, RFI <br />responses, submittal review, record drawings. <br />A sample project schedule is provided on <br />Page 16. <br />Psomas has prepared a fee proposal as a <br />separate PDF and uploaded it to PlanetBids per <br />the City's Q&A. <br />PSOMAS R a MI ie.+a; c;ry m sanr, Aco <br />