My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSOMAS (2)-A-2020-075-03
Clerk
>
Contracts / Agreements
>
P
>
PSOMAS (2)-A-2020-075-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 8:21:48 AM
Creation date
5/6/2020 4:32:18 PM
Metadata
Fields
Template:
Contracts
Company Name
PSOMAS
Contract #
A-2020-075-03
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
10/15/2024
Destruction Year
2024
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Nancy Baker <br />(Continued) <br />Upper Salada Lift Station Generator Replacement, Moulton Niguel <br />Water District, Laguna Niguel, CA: Project Engineer for preliminary <br />design of the generator replacement in Upper Salada Lift Station. The <br />design included an evaluation of two alternative fuel sources (diesel and <br />natural gas/LPG backup). The preliminary design recommended a new <br />350 kW diesel generator with newATS and reconfiguration of existing <br />electrical equipment lineup inside the station. Limited in space, the new <br />generator will be located on adjacent property to be acquired by the <br />Moulton Niguel Water District. <br />Zone 600 10th Street Booster Pump Station Replacement, City of <br />Santa Paula, CA: Project Engineer during construction for replacement <br />of the City's existing Terracina 600 Pump Station with a new Zone 600 <br />Booster Pump Station along 10th Street. The new pump station will <br />increase the capacity and include a new fire pump. The preliminary <br />phase included a hydraulic analysis, and siting and architectural analysis <br />of alternatives to determine a solution for the new station. The new <br />station is equipped with two new demand duty pumps (each at 300 GPM) <br />and one new high flow (fire) pump (4,000 GPM) (250 kW). <br />San Joaquin Marsh Improvements, Irvine Ranch Water District, <br />Irvine, CA: Project Engineer responsible for preparing preliminary design <br />report, final design bid documents, and engineering services during <br />construction for flow control, flow metering, flow treatment, pumping <br />and electrical facilities improvements within the San Joaquin Marsh <br />Wildlife Sanctuary (Marsh), a 300-acre wetland area operated by IRWD. <br />The Marsh receives water from San Diego Creek Channel (SDCC) <br />via the San Diego Creek Pump Station (SDC PS) which contains two <br />submersible non -clog pumps capable of pumping 3,200 GPM. Nancy <br />provided design improvements at the SDC PS that included replacement <br />of both pumps, installation of VFD motors, and replacement of MCC and <br />wet well level transmitters. Additional improvements within the Marsh <br />include installation of flow monitoring (both gravity and pressure) at six <br />locations and pressure and flow control valves to provide control of the <br />water throughout the pond system. <br />Perham Plant Pump Station Improvements, Golden State Water <br />Company, Culver City, CA: Project Manager for the plant upgrade <br />designs, including replacement of an existing pump station with two <br />150-GPM pumps and one 1,500-GPM pump with variable speed drive; <br />design of a temporary booster pump station to provide system water <br />during construction, a natural gas emergency generator and automatic <br />transfer switch; installation of new MCC, PLC and SCADA system; and <br />reconstruction of the driveway. <br />PSOMAS RIP Nw 19-100 city w 5an15 Ana <br />
The URL can be used to link to this page
Your browser does not support the video tag.