Laserfiche WebLink
Krista Kausen, PE, ENV SP I Psomas <br />Project Engineer — Water <br />REGISTRATION <br />2015/CA/P rofessio n al <br />Engineer/Civil/84217 <br />EDUCATION <br />2011/BS/Civil Engineering/ <br />University of California, <br />Irvine <br />CERTIFICATION <br />Envision Sustainability <br />Professional/Institute for <br />Sustainable Infrastructure <br />Krista Kausen has eight years of engineering experience in the water <br />and wastewater industry involving design and construction of pump <br />stations, wells, pipelines, and treatment plants. Her background <br />includes environmental analysis, hydrology, hydraulics, water quality <br />and treatment, and construction support services. She also has on -site <br />field and inspection experience on various projects in Orange and <br />Los Angeles counties. <br />Project Experience <br />Rehabilitation/Replacement of Pressure Reducing Station Nos. 30, <br />31, 32, and 43, and Construction of a New PRS No. 73, City of <br />Anaheim, CA: Project Engineer for preparation of construction <br />documents for rehabilitation and/or replacement of Pressure Regulation <br />Station Nos. 30, 31, 32, and 43, and construction of a new PRS <br />No. 73. The existing pressure regulation stations were constructed <br />in the 1960's and have experienced significant corrosion and overall <br />deterioration. Design services included preparation of a preliminary <br />design memorandum to establish the basis of design, preparation of <br />construction plans, technical specifications and engineer's estimate. <br />Hidden Hills Booster Pump Station, Yorba Linda, CA: Project Engineer <br />for engineering services for the design of an emergency storage basin <br />(ESB) for Santa Margarita Water District's Coto de Caza lift station. <br />Scope of services includes preliminary and final design, construction <br />plans, specifications, estimates of probable construction costs, and <br />engineering support during construction. <br />Rehabilitation of Well 29, City of Santa Ana, CA: Project Engineer for <br />rehabilitation of Well 29, design of a CMU building housing the well and <br />electrical equipment, and site accessibility improvements. <br />La Palma Complex Reservoir Rehabilitation and Pump Station <br />Replacement, City of Anaheim, CA: Project Engineer for providing <br />construction phase engineering for replacement of a 60-year-old pump <br />station and reservoir facilities in central Anaheim. The project included <br />design of a new aluminum roof, hopper bottom tank retrofit in the <br />footprint of an existing 4 MG reservoir which resulted in savings to City of <br />approximately $2 million over conventional concrete or steel alternatives. <br />Scope of services included demolition of a 3 MG reservoir and complete <br />replacement of the existing pump station with a new 10,000 GPM pump <br />station. <br />Laguna Sewer Lift Station Rehabilitation, Laguna Beach, CA: Project <br />Engineer for preparation of construction plans and specifications for <br />rehabilitation of the Laguna SOCWA sewer pump station and other <br />improvements. The existing wet well was in a deteriorated condition and <br />required rehabilitation of all interior concrete surfaces and installation of <br />a new PVC liner. Various improvements included sewage bypass plans, <br />site improvements, odor control system, mechanical piping and valve <br />city ai sin3 Aiii PrP No 19-110 PSOMAS <br />