Laserfiche WebLink
WJE Civic Center Plaza Structural Analysis <br />Structural Analysis of Civic Center Plaza of the Flag/Fountain <br />IN Back up with structural calculations <br />Within WJE's report, appendices will be included that provide the results of findings to support <br />recommendations included in the report. <br />® Deliverables shall include a technical report which summarizes and documents findings <br />including all documents from tasks 1, 2, and 3. <br />WJE will synthesize all observations, findings, recommendations, and cost estimates from Tasks 1 <br />through 3 in a formal technical report. This report will identify and analyze deficiencies noted at both <br />the Plaza of the Flag and the Plaza of the Fountain, focusing on the overall parking structure <br />condition and safety. The report will detail recommendations for repair, including a description and <br />analysis of each repair option and structural calculations to support each recommended repair. <br />Work Schedule <br />WJE has developed the following project work schedule to complete the within approximately ninety <br />days from receipt of the notice to proceed. <br />Week 1 3.,,%�.t '3 .. 8. ,1e ] n:,t.,d g :p}.�;ij0y <br />t <br />Uoord na0on _ Coealnak with Clykr access and planning. <br />pal <br />E u; n g _ _ Meal with Cllpto discuss Initial f,dinge <br />e g'np Oelieable includes lmanlory of conditions <br />Nontlea6uareurpl. one <br />i 1 Sample-- <br />�Remonl <br />h Lab Testing j 1 [ <br />TDefellopineentor,ofPonalitionsal� — <br />_L Rep d <br />a-- <br />MeelwitM1 Cityball sass findings <br />_ 4 _ <br />aq <br />1 ,.t i MeelwM CityA,disass repalroptions and and <br />Iwatial _ cost esllmate <br />OeeelopJ`nlTeehnual Repod, Meet wig, Cityto discuss final nepoM1 <br />SECTION 3: FEE PROPOSAL - Please see separate sealed envelope, as requested <br />SECTION 4: CERTIFICATIONS - Please see Appendix B <br />WJE No. 2020.1370 1 MARCH 11, 2020 <br />Page 10 <br />