Laserfiche WebLink
Particular attention shall be paid to all slope areas, which will, by physical nature, provide for greatest <br />potential runoff, which can contribute to erosion. <br />Contractor shall turn off controllers when adequate rainfall is anticipated. <br />In the event of irrigation system failure, manual watering required to keep the plant material in a <br />vigorous, healthy condition is to be provided by Contractor and the irrigation system shall be repaired <br />immediately at no additional cost to the City. <br />At no time shall Contractor utilize a fire hydrant for irrigation purposes. <br />Contractor will keep system in operation by valve or head adjustment to keep all systems operating at <br />manufacturer's recommended operating pressure. This shall be accomplished by valve throttling <br />pressure gaging. The valves should be throttled to prevent sprinkler heads from fogging, allowing <br />droplets for effective watering. The City of Santa Ana may request a coverage test to evaluate proper <br />settings, timing, usage, or maintenance of system. <br />All valve boxes, controllers, and backflow devices shall be kept clear of plant growth. <br />Contractor shall be responsible for periodic inspection of surface drains located within the landscaped <br />areas. These drains shall be checked to assure proper functioning. Remove any debris or vegetation <br />that might accumulate at the inlet and prevent proper flow of water. <br />Any erosion damage because of Contractor's failure to keep the surface drains clear shall be repaired <br />at Contractor's expense. <br />Irrigation and drainage system repairs shall be compensated on a time and materials basis as agreed <br />to by the Contractor and the City. <br />1.7. GENERAL MAINTENANCE AND CLEAN-UP <br />The Contractor shall collect all clippings, trimmings, cuttings, rubbish and debris, and posted signs at <br />all work sites and dispose of same in a lawful manner per contract requirements at the Contractor's <br />expense. <br />All trash and debris shall be removed from all worksites every day that the landscaper is on site. In <br />addition, all exterior trash cans shall be emptied and cleaned every day that the landscaper is on site. <br />The Contractor shall rake, hand remove, or vacuum leaves that are not absorbed by planting. This shall <br />be done as often as required to maintain a neat appearance, or prevent plants from being smothered <br />by seasonal leaf drop at least weekly or as directed by City of Santa Ana. <br />After heavy windstorms, the entire contract area shall be cleaned of litter, fallen branches, etc. <br />Contractor shall respond to calls from City of Santa Ana immediately. Contractor shall patrol all areas <br />for trees down, fallen branches, hanging branches, debris, and other potential hazards. <br />The Contractor shall keep sidewalks and all paved areas in the medians and under overpasses swept <br />and cleaned of any debris, weeds, dirt, or soil. Tree wells shall be maintained weed free. <br />City of Santa Ana — RFP 20-041 <br />Landscape Maintenance Services for Public Works Agency City Yard Facility <br />