My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH ADOPT RESO FOR PR NO 15-6827
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
06/16/2020
>
75B - PH ADOPT RESO FOR PR NO 15-6827
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2020 5:42:11 PM
Creation date
6/12/2020 2:55:58 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
75B
Date
6/16/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR <br />COUNCIL ACTION <br />CITY COUNCIL MEETING DATE: <br />JUNE 16, 2020 <br />TITLE <br />PUBLIC HEARING: ADOPT A <br />RESOLUTION FOR A MITIGATED <br />NEGATIVE DECLARATION AND <br />MITIGATION MONITORING AND <br />REPORTING PROGRAM FOR THE <br />FAIRVIEW BRIDGE REPLACEMENT <br />AND STREET IMPROVEMENTS FROM <br />9TH STREET TO 16TH STREET <br />(PROJECT NO. 15-6827) <br />(NON -GENERAL FUND) <br />CLERK OF COUNCIL USE ONLY: <br />APPROVED <br />❑ As Recommended <br />❑ As Amended <br />❑ Ordinance on 1"Reading <br />❑ Ordinance on 2i1 Reading <br />❑ Implementing Resolution <br />❑ Set Public Hearing For <br />,K•�►nl►tr».ic•� <br />/s/ Kristine Ridge FILE NUMBER <br />CITY MANAGER <br />RECOMMENDED ACTION <br />1. Adopt a resolution approving the Initial Study/Mitigated Negative Declaration and Mitigation <br />Monitoring and Reporting Program for the Fairview Bridge Replacement and Street <br />Improvements from 9th Street to 16th Street Project. <br />2. Approve the Fairview Bridge Replacement and Street Improvements from 9th Street to 16th <br />Street Project. <br />DISCUSSION <br />Fairview Street is integral to the regional transportation system with the portion of Fairview Street <br />south of the Fairview Street Bridge at the Santa Ana River providing three lanes of vehicle travel in <br />each direction. The long-term plan is to extend the three lanes through the Fairview Street Bridge <br />to provide continuous three -lane regional connectivity. <br />The existing Fairview Street Bridge is only two lanes in each direction and requires significant safety <br />and structural upgrades. In addition, the bridge does not have sidewalks, bike -lanes, or lighting to <br />support multi -modal connectivity. The existing bridge condition causes a traffic "bottleneck" during <br />peak hours. <br />The Fairview Bridge Replacement and Street Improvements from 9th Street to 16th Street Project <br />(Project) consists of improving pedestrian and bicyclist safety, reducing congestion on Fairview <br />Street between 9th Street and 16th Street, and achieving consistency with the Orange County <br />Master Plan of Arterial Highways and the City's General Plan Circulation Element. The proposed <br />project would widen Fairview Street from two lanes to three lanes in each direction, and add a <br />75B-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.