My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Appendix A Natural Environment Study (Minimal Impacts)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
06/16/2020
>
75B - FAIRVIEW BRIDGE PROJECT CD
>
Appendix A Natural Environment Study (Minimal Impacts)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2020 8:35:34 AM
Creation date
6/16/2020 8:17:12 AM
Metadata
Fields
Template:
City Clerk
Date
6/16/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Natural Environment Study (Minimal Impacts) <br />BI0-3 Bat Eviction/Exclusion. To avoid direct mortality of individual bats, <br />humane evictions (if bats are present) and exclusions of roosting bats <br />should be performed under the supervision of a CDFW-approved bat <br />biologist prior to bridge demolition activities. Eviction/exclusion <br />activities should be performed in the fall (September or October) prior <br />to bridge demolition. Exclusion activities may be implemented in one <br />or two phases at the discretion of the qualified bat biologist and in <br />coordination with the Project Design Team. <br />BIO-4 Alternative Bat Roosting Habitat. Alternate bat roosting habitat <br />should be incorporated into the design of the new bridge to replace <br />crevice habitat lost from removal of the existing Fairview Street bridge <br />over the Santa Ana River. The specifications for this replacement <br />habitat should be designed in consultation with a qualified bat <br />biologist. <br />In addition, to avoid potential impacts to bats day roosting in the swallow mud nests <br />at the Fairview Street bridge over the Santa Ana River, the following measure will be <br />implemented: <br />BI0-5 Swallow Nest Removal. If swallow nests are removed to prevent <br />swallows from nesting within the Project Area during construction <br />activities, they should be removed in the fall (i.e., September or <br />October) prior to expected or potential overwintering use by bats, and <br />in a manner that ensures they do not fall to the ground or are otherwise <br />destroyed unless absence of bats is confirmed through inspection by a <br />qualified bat biologist. <br />To minimize any potential indirect impacts to bats foraging and night roosting at the <br />Fairview Street bridge over the Santa Ana River, the following measures will be <br />implemented: <br />BI0-6 Nighttime Lighting During Construction. To minimize temporary <br />indirect impacts during nighttime work for Project construction within <br />200 ft of the bridge structures, night lighting shall be used only in the <br />area actively being worked on and focused on the direct area of work, <br />and airspace access to and from the roost features of a structure shall <br />not be obstructed except in direct work areas. <br />................................................................................................................................................ . <br />44 Fairview Street Improvements from 9th Street to 16th Street and Bridge Replacement Project <br />
The URL can be used to link to this page
Your browser does not support the video tag.