My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Appendix A Natural Environment Study (Minimal Impacts)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
06/16/2020
>
75B - FAIRVIEW BRIDGE PROJECT CD
>
Appendix A Natural Environment Study (Minimal Impacts)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2020 8:35:34 AM
Creation date
6/16/2020 8:17:12 AM
Metadata
Fields
Template:
City Clerk
Date
6/16/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Natural Environment Study (Minimal Impacts) <br />BI0-7 New Bridge Lighting. To avoid permanent indirect impacts to <br />roosting and foraging bats, bridge lighting on the new bridge shall be <br />designed and installed in such a way that light overspill into the Santa <br />Ana River and beneath the bridge are limited to the greatest extent <br />practicable. <br />Since the Project will not affect the culverts and any potential impacts to bats will be <br />avoided by implementing the measures above, no compensatory mitigation is <br />expected to be required. <br />5. Conclusions and Regulatory Determination <br />5.1. Federal Endangered Species Act Consultation Summary <br />An IPAC Trust Resources List was obtained from the USFWS on February 15, 2018, <br />and is provided in Appendix A. A No Effect determination has been made for the <br />FESA-listed species identified during the literature review due to the lack of suitable <br />habitats for these species within the BSA. Therefore, no further consultation with the <br />USFWS is anticipated to be required. <br />5.2. California Endangered Species Act Consultation <br />Summary <br />The proposed Project is expected to have no impact on CESA-listed species. <br />Therefore, no CESA consultation with the CDFW should be required. <br />5.3. Essential Fish Habitat Consultation Summary <br />An official Endangered Species Act Species List was obtained from NOAA Fisheries <br />on March 16, 2018, and is provided in Appendix A. No Essential Fish Habitat is <br />present in the BSA, and a No Effect determination has been made for the FESA-listed <br />species identified during the literature review; therefore, no further consultation with <br />NOAA Fisheries is anticipated to be required. <br />5.4. Wetlands and Other Waters Coordination Summary <br />The Project involves replacing the existing Fairview Street bridge over the Santa Ana <br />River with a wider roadway bridge. As shown on Figure 3, eight existing pier walls <br />(totaling approximately 0.09 ac) would be replaced with four new pier walls, for a <br />total of 0.05 ac of new permanent fill within delineated USACE/RWQCB and CDFW <br />nonwetland aquatic resources. Since the proposed bridge support structures are <br />smaller in area than the existing support structures, a net increase in channel <br />................................................................................................................................................ . <br />Fairview Street Improvements from 9th Street to 16th Street and Bridge Replacement Project 45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.