My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Appendix A Traffic Analysis Report
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
06/16/2020
>
75B - FAIRVIEW BRIDGE PROJECT CD
>
Appendix A Traffic Analysis Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2020 8:40:23 AM
Creation date
6/16/2020 8:25:01 AM
Metadata
Fields
Template:
City Clerk
Date
6/16/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRAFFIC IMPACT ANALYSIS FAIRVIEW STREET IMPROVEMENTS FROM 9T" STREET TO 16T" STREET AND /\ <br />JUNE 2018 BRIDGE REPLACEMENT PROJECT J" <br />SANTA ANA, CALIFORNIA <br />TABLE OF CONTENTS <br />LIST OF ABBREVIATIONS AND ACRONYMS............................................................................................ iii <br />INTRODUCTION.......................................................................................................... 1 <br />ExistingFacilities............................................................................................................................ <br />1 <br />ProjectDescription........................................................................................................................ <br />1 <br />METHODOLOGY.......................................................................................................... 4 <br />EXISTING (2017) CONDITIONS..................................................................................... 6 <br />FUTURE CONDITIONS.................................................................................................. 9 <br />2021 No Build Conditions............................................................................................................ <br />10 <br />2021 Build Conditions................................................................................................................. <br />12 <br />2040 No Build Conditions............................................................................................................14 <br />2040 Build Conditions.................................................................................................................16 <br />UNSIGNALIZED QUEUING ANALYSIS.......................................................................... <br />18 <br />MITIGATION MEASURE............................................................................................. <br />18 <br />CONCLUSIONS.......................................................................................................... <br />19 <br />APPENDICES <br />A: Existing Counts <br />B: LOS Worksheets <br />C: OCTAM Forecast Plots <br />P:\WKE1702\Traffic\doc\Traffic Analysis Report rev - Caltrans Comments.docx u06/07/18» <br />
The URL can be used to link to this page
Your browser does not support the video tag.