My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Appendix A Traffic Analysis Report
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
06/16/2020
>
75B - FAIRVIEW BRIDGE PROJECT CD
>
Appendix A Traffic Analysis Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2020 8:40:23 AM
Creation date
6/16/2020 8:25:01 AM
Metadata
Fields
Template:
City Clerk
Date
6/16/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRAFFIC IMPACT ANALYSIS FAIRVIEW STREET IMPROVEMENTS FROM 9T" STREET TO 16T" STREET AND /\ <br />JUNE 2018 BRIDGE REPLACEMENT PROJECT J" <br />SANTA ANA, CALIFORNIA <br />FIGURES AND TABLES <br />FIGURES <br />Figure1: Project Area............................................................................................................................. 2 <br />Figure2: Existing Facilities...................................................................................................................... <br />3 <br />Figure 3: With Project Facilities.............................................................................................................. <br />5 <br />Figure 4: Existing Traffic Volumes.......................................................................................................... <br />8 <br />Figure 5: 2021 No Build Traffic Volumes.............................................................................................. <br />11 <br />Figure 6: 2021 Build Traffic Volumes.................................................................................................... <br />13 <br />Figure 7: 2040 No Build Traffic Volumes..............................................................................................15 <br />Figure 8: 2040 Build Traffic Volumes....................................................................................................17 <br />I CA 1.14*� <br />Table A: Existing Intersection LOS Summary.......................................................................................... 7 <br />Table B: Existing ADT Volumes and LOS................................................................................................. 7 <br />Table C: 2021 Intersection LOS Summary............................................................................................12 <br />Table D: 2021 ADT Volumes and LOS...................................................................................................12 <br />Table E: 2040 Intersection LOS Summary............................................................................................14 <br />Table F: 2040 ADT Volumes and LOS....................................................................................................16 <br />Table G: 2040 Build Fairview Street Turn Pocket Queuing..................................................................18 <br />P:\WKE1702\Traffic\doc\Traffic Analysis Report rev - Caltrans Comments.docx u06/07/18» ii <br />
The URL can be used to link to this page
Your browser does not support the video tag.