Laserfiche WebLink
HCM 6th TWSC <br />North Fairview Bridge Widening Improvement Project (WKE1702) <br />4: N Fairview Street <br />& W 9th Street <br />01/24/2018 <br />Intersection <br />Int Delay, s/veh <br />0.9 <br />Movement <br />EBL <br />EBT <br />EBR WBL <br />WBT <br />WEIR <br />NBL NBT <br />NBR <br />SBL <br />SBT <br />BR <br />Lane Configurations <br />4, <br />4, <br />) W. <br />Vi <br />Tt <br />?" <br />Traffic Vol, veh/h <br />1 <br />0 <br />38 2 <br />0 <br />13 <br />49 1444 <br />66 <br />25 <br />1405 <br />26 <br />_ <br />Future Vol, veh/h <br />1 <br />0 <br />38 2 <br />0 <br />13 <br />49 1444 <br />66 <br />25 <br />1405 <br />26 <br />Conflicting Peds, #/hr <br />0 <br />0 <br />0 0 <br />0 <br />0 <br />0 0 <br />0 <br />0 <br />0 <br />0 <br />Sign Control <br />Stop <br />Stop <br />Stop Stop <br />Stop <br />Stop <br />Free Free <br />Free <br />Free <br />Free <br />Free <br />RT Channelized <br />None <br />None <br />- <br />None <br />- <br />None <br />Storage Length <br />55 <br />95 <br />145 <br />Veh in Median Storage, <br /># - <br />0 <br />0 <br />0 <br />- <br />0 <br />- <br />Grade, % <br />- <br />0 <br />- - <br />0 <br />- <br />- 0 <br />- <br />- <br />0 <br />- <br />Peak Hour Factor <br />98 <br />98 <br />98 98 <br />98 <br />98 <br />98 98 <br />98 <br />98 <br />98 <br />98 <br />Heavy Vehicles, % <br />2 <br />2 <br />2 2 <br />2 <br />2 <br />2 2 <br />2 <br />2 <br />2 <br />2 <br />Mvmt Flow <br />1 <br />0 <br />39 2 <br />0 <br />13 <br />50 1473 <br />67 <br />26 <br />1434 <br />27 <br />Major/Minor Mini <br />Minorl <br />Majorl <br />tii <br />Conflicting Flow All <br />2175 <br />3126 <br />717 2376 <br />3120 <br />770 <br />1461 0 <br />0 <br />1540 <br />0 <br />0 <br />Stage 1 <br />1486 <br />1486 <br />- 1607 <br />1607 <br />- <br />- - <br />- <br />- <br />- <br />- <br />Stage 2 <br />689 <br />1640 <br />. 769 <br />1513 <br />- <br />- <br />- <br />Critical Hdwy <br />6.99 <br />6.54 <br />6.94 6.99 <br />6.54 <br />7.14 <br />4.14 - <br />- <br />5.34 <br />- <br />- <br />Critical Hdwy Stg 1 <br />6.54 <br />5.54 <br />- 7.34 <br />5.54 <br />- <br />- <br />- <br />Critical Hdwy Stg 2 <br />6.74 <br />5.54 <br />- 6.54 <br />5.54 <br />- <br />- <br />- <br />Follow-up Hdwy <br />3.67 <br />4.02 <br />3.32 3.67 <br />4.02 <br />3.92 <br />2.22 - <br />- <br />3.12 <br />- <br />- <br />Pot Cap-1 Maneuver <br />36 <br />11 <br />372 26 <br />11 <br />295 <br />458 <br />213 <br />Stage 1 <br />128 <br />186 <br />- 75 <br />163 <br />- <br />- <br />- <br />Stage 2 <br />376 <br />157 <br />- 350 <br />181 <br />- <br />- <br />- <br />Platoon blocked, % <br />- <br />- <br />- <br />- <br />Mov Cap-1 Maneuver <br />29 <br />9 <br />372 19 <br />9 <br />295 <br />458 <br />213 <br />i <br />Mov Cap-2 Maneuver <br />29 <br />9 <br />- 19 <br />9 <br />- <br />- <br />- <br />Stage 1 <br />114 <br />163 <br />67 <br />145 <br />Stage 2 <br />320 <br />140 <br />- 275 <br />159 <br />- <br />- - <br />- <br />- <br />- <br />- <br />Approach <br />EB <br />NB <br />SB <br />- <br />HCM Control Delay, s <br />19.7 <br />47.4 <br />0.4 <br />0.4 <br />HCM LOS <br />C <br />E <br />Minor Lane/MajorMvmt <br />NBL <br />NBT NBREBLn1WBLnl <br />SBL SET <br />SBR <br />- <br />Capacity (veh/h) <br />458 <br />- - <br />285 <br />100 <br />213 - <br />- <br />HCM Lane V/C Ratio <br />0,109 <br />0.14 <br />0.153 <br />0.12 <br />HCM Control Delay (s) <br />13.8 <br />19.7 <br />47.4 <br />24.2 <br />- <br />HCM Lane LOS <br />B <br />- - <br />C <br />E <br />C - <br />- <br />HCM 95th %tile Q(veh) <br />0.4 <br />0.5 <br />0.5 <br />0.4 <br />i <br />5:00 pm 01/23/2018 Existing - PM Peak Hour <br />Synchro 10 Report <br />LSA - DL <br />Page 3 <br />ExPM Thu Apr 26, 2018 17:36:09 Page 3-1 <br />North Fairview Bridge Widening Improvement Project (WKE1702) <br />Existing Conditions <br />PM Peak Hour <br />-------------------------------------------------------------------------------- <br />Level Of Service Computation Report <br />ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) <br />Intersection #5 Fairview Street (NS) / West Civic Center Drive (EW) <br />Cycle (sec): 100 Critical Vol./Cap.(X): 0.640 <br />Loss Time (sec): 5 Average Delay (sec/veh): xxxxx <br />Optimal Cycle: 32 Level Of Service: B <br />Street Name: Fairview Street west Civic Center Drive <br />Approach: North Bound South Bound East Bound West Bound <br />Movement: L - T - R L - T - R L - T - R L - T - R <br />------------I--------------- II--------------- II--------------- II ---------------I <br />Control: Protected Protected Split Phase Split Phase <br />Rights: Include Include Include Include <br />Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 <br />Y+R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 <br />Lanes: 1 0 2 1 0 1 0 2 1 0 0 1 0 0 1 1 1 0 0 1 <br />---------------------------II---------------II---------------II---------------I <br />Volume Module: <br />Base Vol: 10 1367 432 155 1290 1 1 3 4 453 2 184 <br />Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Initial Bse: 10 1367 432 155 1290 1 1 3 4 453 2 184 <br />User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />PHF Volume: 10 1367 432 155 1290 1 1 3 4 453 2 184 <br />Deduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 <br />Reduced Vol: 10 1367 432 155 1290 1 1 3 4 453 2 184 <br />PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />FinalVolume: 10 1367 432 155 1290 1 1 3 4 453 2 184 <br />---------------------------II---------------II---------------II--------------- <br />I <br />Saturation Flow Module: <br />Sat/Lane: 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 <br />Adjustment: 0.94 1.00 1.00 0.94 1.00 1.00 1,00 1.00 0.94 0.97 1.00 0.94 <br />Lanes: 1.00 2.28 0.72 1.00 2.99 0.01 0.25 0.75 1.00 1.99 0.01 1.00 <br />Final Sat.: 1598 3875 1225 1598 5096 4 425 1275 1598 3283 15 1598 <br />------------ I---------------II---------------II---------------II---------------I <br />Capacity Analysis Module: <br />Vol/Sat: 0.01 0.35 0.35 0.10 0.25 0.25 0.00 0.00 0.00 0.14 0.13 0.12 <br />Crit Moves: **** **** **** **** <br />Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LSA ASSOC. IRVINE, CA <br />