My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Appendix A Traffic Analysis Report
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
06/16/2020
>
75B - FAIRVIEW BRIDGE PROJECT CD
>
Appendix A Traffic Analysis Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2020 8:40:23 AM
Creation date
6/16/2020 8:25:01 AM
Metadata
Fields
Template:
City Clerk
Date
6/16/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2021 NP AM Thu Apr 26, 2018 17:16:30 Page 2-1 <br />-------------------------------------------------------------------------------- <br />North Fairview Bridge Widening Improvement Project (WKE1702) <br />2021 No Project Conditions <br />AM Peak Hour <br />-------------------------------------------------------------------------------- <br />Level Of Service Computation Report <br />ICU 1(Loss as Cycle Length $) Method (Base Volume Alternative) <br />.......... <br />Intersection 11 Fairview Street (NS) / West 17th Street (EW) <br />.......*........*................ <br />Cycle (sec): Too Critical Vol./Cap.(X): 0.853 <br />Loss Time (sec): 5 Average Delay (sec/veh): xxx <br />Optimal Cycle: 66 Level Of Service: xxD <br />................................................................................ <br />Street Name: Fairview Street West 17th Street <br />Approach: North Bound South Bound East Bound West Bound <br />Movement: L - T - R L - T - R L - T - R L - T - R <br />------------I--------------- II--------------- II--------------- II ---------------I <br />Control: Protected Protected Protected Protected <br />Rights: Include Include Include Include <br />Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 <br />Y+R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 <br />Lanes: 2 0 2 0 1 2 0 2 0 1 1 0 3 0 1 1 0 2 1 0 <br />---------------------------II---------------II---------------II---------------I <br />Volume Module: <br />Base Vol: 179 953 250 548 1203 126 218 1080 248 205 432 240 <br />Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Initial Bse: 179 953 250 548 1203 126 218 1080 248 205 432 240 <br />User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />PHF Volume: 179 953 250 548 1203 126 218 1080 248 205 432 240 <br />Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 <br />Reduced Vol: 179 953 250 548 1203 126 218 1080 248 205 432 240 <br />PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />FinalVolume: 179 953 250 548 1203 126 218 1080 246 205 432 240 <br />--------------------------- II---------------II---------------II---------------I <br />Saturation Flow Module: <br />Sat/Lane: 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 <br />Adjustment: 0.88 1.00 0.94 0.88 1.00 0.94 0.94 1.00 0.94 0.94 1.00 0.94 <br />Lanes: 2.00 2.00 1.00 2.00 2.00 1.00 1.00 3.00 1.00 1.00 2.00 1.00 <br />Final Sat.: 2992 3400 1598 2992 3400 1598 1598 5100 1598 1598 3400 1598 <br />------------ I---------------II---------------II---------------II---------------I <br />Capacity Analysis Module: <br />Vol/Sat: 0.06 0.28 0.16 0.18 0.35 0.08 0.14 0.21 0.16 0.13 0.13 0.15 <br />Crit Moves: **** **** **** **** <br />................................................................................ <br />Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LSA ASSOC. IRVINE, CA <br />HCM 6th TWSC <br />North Fairview Bridge Widening Improvement Project (WKE1702) <br />2: N Fairview Street <br />& W 16th Street <br />04/26/2018 <br />Intersection <br />Int Delay, s/veh <br />1.2 <br />Movement <br />EBL <br />EBR <br />NBL NBT SBT <br />SBR <br />Lane Configurations <br />Y <br />Vi t+ t+ <br />pr <br />Traffic Vol, veh/h <br />9 <br />103 <br />1 1374 1658 <br />1 <br />- <br />Future Vol, veh/h <br />9 <br />103 <br />1 1374 1658 <br />1 <br />Conflicting Peds, #/hr <br />0 <br />0 <br />0 0 0 <br />0 <br />- <br />Sign Control <br />Stop <br />Stop <br />Free Free Free <br />Free <br />RT Channelized <br />- <br />None <br />- None <br />None <br />- <br />Storage Length <br />0 <br />50 - <br />65 <br />Veh in Median Storage, <br /># 2 <br />- 0 0 <br />- <br />- <br />Grade, % <br />0 <br />- <br />. 0 0 <br />- <br />Peak Hour Factor <br />91 <br />91 <br />91 91 91 <br />91 <br />Heavy Vehicles, % <br />2 <br />2 <br />2 2 2 <br />2 <br />Mvmt Flow <br />10 <br />113 <br />1 1510 1822 <br />1 <br />- <br />Major/Minor Minor2 <br />Majorl Major2 <br />Conflicting Flow All <br />2579 <br />911 <br />1823 0 - <br />0 <br />Stage 1 <br />1822 <br />- <br />- - <br />- <br />- <br />Stage 2 <br />757 <br />- <br />- <br />Critical Hdwy <br />6.84 <br />6.94 <br />4.14 - - <br />- <br />- <br />Critical Hdwy Stg 1 <br />5.84 <br />- <br />- <br />Critical Hdwy Stg 2 <br />5.84 <br />- <br />- <br />Follow-up Hdwy <br />3.52 <br />3.32 <br />2.22 - - <br />- <br />Pot Cap-1 Maneuver <br />21 <br />277 <br />332 <br />Stage 1 <br />114 <br />- <br />- <br />Stage 2 <br />424 <br />- <br />- <br />Platoon blocked, % <br />- - <br />- <br />Mov Cap-1 Maneuver <br />21 <br />277 <br />332 <br />Mov Cap-2 Maneuver <br />104 <br />- <br />- <br />Stage 1 <br />114 <br />_ <br />Stage 2 <br />424 <br />- <br />- - - <br />- <br />Approach <br />EB <br />NB SB <br />- <br />HCM Control Delay, s <br />33.9 <br />0 0 <br />_ <br />HCM LOS <br />D <br />Minor Lane/MajorMvmt <br />NBL <br />NBTEBLnl SBT <br />SBR <br />- <br />Capacity (veh/h) <br />332 <br />244 <br />_ <br />HCM Lane V/C Ratio <br />0,003 <br />0.504 <br />HCM Control Delay (s) <br />15.9 <br />33.9 <br />- <br />HCM Lane LOS <br />C <br />- D - <br />- <br />HCM 95th %tile Q(veh) <br />0 <br />2.6 <br />i <br />5:00 pm 01/23/2018 2021 NP - AM Peak Hour <br />Synchro 10 Report <br />LSA - DL <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.