Laserfiche WebLink
<br />F AIRVIEW B RIDGE R EPLACEMENT AND S TREET I MPROVEMENTS (9TH S TREET TO 16TH S TREET) P ROJECT <br />C ITY OF S ANTA A NA, C ALIFORNIA <br />M ITIGATION M ONITORING A ND R EPORTING P ROGRAM <br />A PRIL 2020 <br /> <br />R:\WKE1702\ISMND\Public Review Draft ISMND\Appendix D Fairview St Bridge MMRP.docx (04/02/20) 12 <br />Table A.1: Mitigation Monitoring and Reporting Program <br />Mitigation Measures <br />Responsible Party Timing for <br />Mitigation Measure <br />Completion <br />Date <br />Mitigation Measure UTL-2: Updated Utility Survey. During the design phase, the Project Engineer will <br />provide the City of Santa Ana (City) Director of Public Works, or designee, with an updated utility survey <br />to update information on known utility facilities as well as previously unidentified/unknown or new <br />utility facilities within the disturbance limits. <br />Project Engineer/ City <br />of Santa Ana Public <br />Works Director or <br />designee <br />During Project design <br />3.20 WILDFIRE <br />There are no significant impacts to wildfire. <br />Source: LSA (April 2020). <br /> <br />