My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Appendix D Fairview St Bridge MMRP
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
06/16/2020
>
75B - FAIRVIEW BRIDGE PROJECT CD
>
Appendix D Fairview St Bridge MMRP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2020 8:28:40 AM
Creation date
6/16/2020 8:25:55 AM
Metadata
Fields
Template:
City Clerk
Date
6/16/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />F AIRVIEW B RIDGE R EPLACEMENT AND S TREET I MPROVEMENTS <br />(9TH S TREET TO 16TH S TREET) P ROJECT <br />C ITY OF S ANTA A NA, C ALIFORNIA <br />M ITIGATION M ONITORING A ND R EPORTING P ROGRAM <br />A PRIL 2020 <br /> <br />R:\WKE1702\ISMND\Public Review Draft ISMND\Appendix D Fairview St Bridge MMRP.docx (04/02/20) 2 <br />MITIGATION MONITORING PROCEDURES <br />The mitigation monitoring and reporting program for the proposed project was prepared in <br />compliance with PRC Section 21081.6. It describes the requirements and procedures to be followed <br />by the City of Santa Ana to ensure that all mitigation measures adopted as part of the proposed <br />project would be carried out as described in this IS/MND. Table A.1 lists each of the mitigation <br />measures specified in this IS/MND and identifies the party or parties responsible for implementation <br />and monitoring of each measure. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.