Laserfiche WebLink
<br />F AIRVIEW B RIDGE R EPLACEMENT AND S TREET I MPROVEMENTS <br />(9TH S TREET TO 16TH S TREET) P ROJECT <br />C ITY OF S ANTA A NA, C ALIFORNIA <br />M ITIGATION M ONITORING A ND R EPORTING P ROGRAM <br />A PRIL 2020 <br /> <br />R:\WKE1702\ISMND\Public Review Draft ISMND\Appendix D Fairview St Bridge MMRP.docx (04/02/20) 2 <br />MITIGATION MONITORING PROCEDURES <br />The mitigation monitoring and reporting program for the proposed project was prepared in <br />compliance with PRC Section 21081.6. It describes the requirements and procedures to be followed <br />by the City of Santa Ana to ensure that all mitigation measures adopted as part of the proposed <br />project would be carried out as described in this IS/MND. Table A.1 lists each of the mitigation <br />measures specified in this IS/MND and identifies the party or parties responsible for implementation <br />and monitoring of each measure. <br /> <br />