My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PALP, INC DBA EXCEL PAVING COMPANY
Clerk
>
Contracts / Agreements
>
PROJECTS
>
PALP, INC DBA EXCEL PAVING COMPANY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2020 9:10:22 AM
Creation date
6/30/2020 4:03:39 PM
Metadata
Fields
Template:
Contracts
Company Name
PALP, INC DBA EXCEL PAVING COMPANY
Contract #
18-9002
Agency
Public Works
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA ADDENDUM TWO <br />PROPOSAL <br />PROJECT NO.: 18-9002 <br />BUSH STREET BICYCLE BOULEVARD <br />PROJECT NO.: 21-6442 <br />BUSH STREET BIKEWAY WATER IMPROVEMENTS <br />PROJECT NO.: 21-6443 <br />BUSH STREET BIKEWAY SEWER IMPROVEMENTS <br />UNIT <br />ITEM <br />NO. <br />DESCRIPTION <br />QTY. <br />UNIT <br />PRICE <br />COST <br />59 <br />Construct New P.C.C. Sewer <br />3 <br />EA <br />$ $3,250.00 <br />$9,750.00 <br />Manhole <br />$ <br />Remove Existing Sewer Main <br />60 <br />and Construct 6" VCP Sewer <br />40 <br />LF <br />$ $195.00 <br />$ $7, 800.00 <br />Main <br />61 <br />CCTV Inspection of Existing <br />2,540 <br />LF <br />$ $2.60 <br />$ $6 , 6 04.00 <br />Sewer Main <br />62 <br />CCTV Inspection of Existing <br />66 <br />EA <br />$ $130.00 <br />$ $a, 580.00 <br />Sewer Laterals <br />63 <br />Vertical Offset (As -Needed)* <br />5 <br />EA <br />$ $1, 300.00 <br />$ $6, 500.00 <br />64 <br />2" Air Vacuum and Release <br />5 <br />EA <br />1,300.00 <br />$ <br />$6,500.00 <br />$ <br />Valve (As -Needed)* <br />Additional Trenching Cost to <br />65 <br />Install Water Pipeline 18" — 30" <br />250 <br />LF <br />$ $130.00 <br />$ $32,500.00 <br />Deeper (Total 54" to 66" cover) <br />As -Needed * <br />66 <br />COLD MILLING* <br />8,500 <br />SF <br />$ $2.60 <br />$ $22,100.00 <br />67 <br />ASPHALT RUBBER HOT <br />105 <br />TN <br />$ <br />$ $24,570.00 <br />MIX (ARHM)* <br />$234.00 <br />68 <br />As-Builts <br />1 <br />LS <br />$ 15,000 <br />$ 15,000 <br />P-6 of P-22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.