My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT FOR ELEVATOR MAINTENANCE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
07/07/2020
>
25C - AGMT FOR ELEVATOR MAINTENANCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2020 4:43:19 PM
Creation date
7/2/2020 4:30:01 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25C
Date
7/7/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADDITIONAL REQUIREMENTS <br />The Contractor shall be an independent Contractor capable of providing experienced, <br />knowledgeable and professional staff. The Contractor shall adhere to established <br />schedules. <br />The Contractor shall comply with all federal, state and local laws, rules, regulations, <br />ordinances, and statutes. <br />The Contractor shall furnish a qualified elevator mechanic on the job site for performance <br />of examinations and preventative maintenance. Said elevator mechanic shall provide <br />preventative maintenance at the job site as follows: <br />Hydraulic elevators — 45 minutes to 1 hours <br />Traction elevators — 1 to 2 hours <br />Wheelchair lifts — 30 minutes <br />Contractor's mechanic shall check into the manager's or maintenance office when he <br />arrives and when he leaves the building. Copies of mechanic's time ticket verifying time <br />spent on each visit, shall be left with building manager or maintenance supervisor. <br />---End of SCOPE OF WORK Section.--- <br />25C-24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.