My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - RES STREET REPAIR PROJECT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
07/07/2020
>
23A - RES STREET REPAIR PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2020 4:38:18 PM
Creation date
7/2/2020 4:31:34 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
7/7/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR <br />COUNCIL ACTION <br />M1111Vcdla,Is] 10Ji1=I =1111I1,lei •7e%9:9 <br />[a]I=11N:(+] ad la, Eel I WWI =11115•7, IWA <br />JULY 7, 2020 <br />TITLE: <br />APPROVED <br />AWARD A CONSTRUCTION CONTRACT TO <br />❑ <br />As Recommended <br />ALL AMERICAN ASPHALT IN THE AMOUNT <br />❑ <br />As Amended <br />OF $698,227 FOR THE FISCAL YEAR <br />❑ <br />Ordinance on 1st Reading <br />2019-20 RESIDENTIAL STREET REPAIR <br />❑ <br />Ordinance on 2nd Reading <br />PROJECT WITH AN ESTIMATED TOTAL <br />❑ <br />Implementing Resolution <br />DELIVERY COST OF $919,978 <br />❑ <br />Set Public Hearing For <br />(PROJECT NO 20-7533) <br />(NON -GENERAL FUND) <br />CONTINUED TO <br />/s/ Kristine Ridge <br />FILE <br />NUMBER <br />CITY MANAGER <br />RECOMMENDED ACTION <br />Award a contract to All American Asphalt in the amount of $698,227 for construction of the <br />Fiscal Year 2019-20 Residential Street Repair Program Project for the term beginning upon <br />execution of the contract and ending upon project completion, and authorize the City Manager <br />to execute the contract subject to non -substantive changes approved by the City Manager and <br />the City Attorney. <br />2. Approve the Project Cost Analysis for a total estimated construction delivery cost of $919,978, <br />which includes $698,227 for the construction contract; $34,000 for contract administration; <br />$41,000 for construction engineering, inspection, and testing; and a $146,751 project <br />contingency (approximately 21 % of the construction contract). <br />DISCUSSION <br />The City's Pavement Management System has identified Garnsey Street from McFadden Avenue <br />to Richland Street, and Highland Street from Flower Street to Broadway as roads in need of <br />rehabilitation (Exhibit 1). Performing rehabilitative work on these streets will prevent accelerated <br />deterioration from weather, age, and heavy use. <br />The improvements include performing localized concrete pavement reconstruction, replacing <br />damaged concrete curbs, gutters, sidewalks, cross gutters, and curbs ramps, and sealing cracks <br />to prevent deterioration from water infiltration. Once completed, these improvements will enhance <br />the ride quality, surface drainage, and appearance at both locations. The project was programmed <br />for Fiscal Year 2019-20, and design was completed within that fiscal year. Because of COVID-19, <br />there was no opportunity to present the project to the City Council before June 30, 2020. <br />23A-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.