My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - RES STREET REPAIR PROJECT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
07/07/2020
>
23A - RES STREET REPAIR PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2020 4:38:18 PM
Creation date
7/2/2020 4:31:34 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
7/7/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Award Construction Contract to All American Asphalt <br />Residential Street Repair Program Fiscal Year 2019-2020 <br />July 7, 2020 <br />Page 2 <br />Public Outreach and Contractor Participation <br />To provide an opportunity for local vendors to submit bids, a Notice Inviting Bids was advertised in <br />the Orange County Register newspaper on March 17 and 24, 2019. Bids were received <br />electronically via the City's web -based electronic bidding system, PlanetBids, on April 7, 2020 <br />Through the PlanetBids online portal, vendors may register to receive notifications on all current <br />and future City projects, as well as download contract documents, receive project updates and <br />submit bids electronically. <br />A total of 585 vendors, including 28 located in the City of Santa Ana, were notified of the project <br />via PlanetBids. Thirty-four vendors requested bidding documents and three bids were received <br />with only the bid submitted by All American Asphalt in the amount of $698,227 being responsive <br />(Exhibit 2). The bids submitted by Nobest Incorporated and by Hardy & Harper, Inc. did not include <br />the required Community Development Block Grant (CDBG) documents. Failure to certify <br />submission of these mandatory documents would result in a loss of funding. The two bids were <br />rendered non -responsive due to the missing documents. Based on this, the bid analysis and a <br />contractor's reference check, staff recommends awarding the construction contract (Exhibit 3) to <br />All American Asphalt in the amount bid. No bids were received from Santa Ana contractors. <br />RANK <br />BIDDER'S NAME <br />LOCATION <br />BASE BID <br />1 <br />All American Asphalt <br />Corona <br />$698,227 <br />2 <br />Nobest Incorporated <br />Westminster <br />Non -responsive <br />3 <br />Hardy & Harper, Inc. <br />Lake Forest <br />Non -responsive <br />Project Delivery <br />To deliver a complete project, in addition to the construction contract, the estimated total cost to <br />deliver the project also requires construction administration, inspection, and testing, along with an <br />allowance for contingencies to account for unexpected or unforeseen conditions. Construction <br />administration and inspection includes construction management; implementation of the City's <br />Community Workforce Agreement requirements; inspection of the Contractor's work to ensure <br />contract compliance, workmanship, and quality; and material testing. As indicated in the Cost <br />Analysis (Exhibit 4) and as summarized in the table below, the estimated total construction delivery <br />cost of the project is $919,978. <br />Construction Contract <br />$698,227 <br />Construction Administration, Inspection, and Testing <br />$75,000 <br />Contingencies <br />$146,751 <br />ESTIMATED CONSTRUCTION DELIVERY COST <br />$919,978 <br />ENVIRONMENTAL IMPACT <br />23A-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.