My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BUILDING NETWORKS, INC.
Clerk
>
Contracts / Agreements
>
B
>
BUILDING NETWORKS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2020 11:01:09 AM
Creation date
8/4/2020 10:50:30 AM
Metadata
Fields
Template:
Contracts
Company Name
BUILDING NETWORKS, INC.
Contract #
N-2020-127
Agency
INFORMATION TECHNOLOGY
Expiration Date
1/23/2021
Insurance Exp Date
4/7/2021
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
{.j§t-�4BUILID ING <br />;•;,;�N ETW 0 RKS <br />Professional Fees and Expenses <br />The fee for consulting engineering services will be invoiced according to a lump sum as indicated in the <br />schedule below. Invoices will be provided on a semi-monthly basis in proportion to work completed. <br />Reimbursable expenses will be invoiced in addition to the Professional Fees at cost plus 10%. If the <br />client does not want to pay a markup for expenses, the Engineer may request direct billing to Client for <br />services subject to reimbursement. <br />]eurintir <br />Scoping Study $5,995 <br />Bid Support Services $2,000 <br />Construction Administration See Alternate <br />Professional Fee Total (Professional Fees Only) $7,995 <br />Reimbursable (Billed as Incurred) Cost+ 10% <br />Alternate Services: <br />Construction Administration $2,500 <br />If you have any questions or comments, please feel free to contact us: If this Proposal is acceptable, <br />please sign the attached Terms and Conditions and return to us the entire executed document. <br />We look forward to working with you on this Project. <br />Sincerely, <br />BUILDING NETWORKS GROUP <br />Jun Yang, PE, LEED AP <br />Managing Principal <br />HVAC Life Cycle Replacement Scoping Study Page 15 <br />City of Santa Ana Revised 07/07/2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.