My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYM ENGINEERING, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
HYM ENGINEERING, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2022 10:01:01 AM
Creation date
8/4/2020 4:23:06 PM
Metadata
Fields
Template:
Contracts
Company Name
HYM ENGINEERING, INC.
Contract #
P 18-6903
Agency
Public Works
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Traffic Loops Crackfilling, Inc. <br />946 S. Emerald Street, Anaheim CA 92804 • Tel: (714) 520 4025 Fax: (714) 520 4027 <br />•quote Is valid for 180 days from the date of this proposal. <br />-In case of discrepancy between the unit price and the total set forth for a unit basis Item, the unit price shall prevail.MM <br />•10 days notice required for scheduling, <br />-24 hours notice required for rescheduling. <br />-Site must be ready with cat -track, permanent striping, grinding, asphalt, approvals, etc. prior to loop Installation.. <br />Access to the Job site must be furnished by Contractor, the general contractor, lessee or other party ordering work. <br />-Additional charges may Incur for the following: <br />a) Site Is not ready (for TLC's scope of work) the day of scheduled work or delays <br />b) Extra move -ins <br />c) When minimum move -In requirements are not met (if noted In quote) <br />-All changes to the original scope of work or proposed extra work must be directed by the Contractor In writing prior to TraffIc Loop Crackhlling, Inc. (TLC) before <br />performing this work. No extra work or additional work will be performed without written authorhation. <br />-This quote will not be valid If there are any changes or deletions of any Item post bid and will need revised pricing. <br />-Total bid must be accepted (must use all line Items) unless otherwise noted or agreed to. If you need revised pricing far only a portion of the work,. contact Estimator. <br />-TLC will not be Impacted by Liquidated Damages assessed by the Contractor /Agency due to an Inadequate amount of Urn to complete TLC operations. <br />-Contractor to provide monthly progress payments for all completed work In accordance with the bid pricing schedule. Monthly payments must be received In full by <br />TLC no later than 10 calendar days after the Contractor receives payment from Owner for our completed work. <br />•Retention % Is to be withheld only as per the Owner's requirements. <br />-Contractor hereby agrees that time shall be of the essence in regard to all payments provided for herein, and lfany payment Is not made when due, Contractor <br />agrees to pay all collection costs and expenses Including costs of suit and any related attorney's fees and costs and also hereby waives the benefit of any statute of <br />limitation that would prohibit an action of TLC to enforce the terms and conditions of this Contract Including but not limited to any right to <br />recovery of attorney's fees and costs. The laws of the State of California shall control all aspects of this contract except as to lien matters, which will be governed by <br />the laws of the state where the subject property Is located. <br />-TLC requires a written contract, purchase order or signed quote prior to the start of work. <br />-The language and terms used in this exhibit supersede any conflicting terms In the Subcontract Agreement. <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.