Laserfiche WebLink
If you are the apparent low, please Infm•m CPE, within 48 hours. Long lead materials apply. <br />CAU ORNIA PROFESSIONAL ENGINEERING, INC. <br />Estimate Number <br />Project Name: <br />Project #: <br />Agency: <br />Bid Due Date: <br />Hazard Ave <br />18-6903 <br />CITY OF SANTA ANA <br />212612020 <br />19062 San Jose Avenue, La Puente, CA 91748 <br />License # 793907 Exp: 04/30/2021 <br />Classifications: A, C-10, C-20 <br />LSBE Certified LA County #54567 Exp: 11/30/2020 <br />SEE Certified DGS #54567 Exp: 11/30/2020 <br />SMBE/DBE/UDBE Certified Caltrans #31277 <br />DIR #1000377609 Exp,06/30/2020 <br />Union Signatory Laborer's Local and IBEW <br />Bid Due Time: 2:00 PM <br />Conditions Set Forth: <br />1, Estimate based on one (1) mobilization unless noted otherwise. Additional mobilization at $3,500.00/ea. <br />2, If loop work: stubout must be existing & marked If not called out to be replaced per plans. Cat -tracking shall be approved prior. Should loop <br />quantities be decreased, a minimum mobilization of $4,500.00 shall supersede. <br />3. One work day based on eight (8) standard consecutive work hours per day. At least 3-weeks notification required; subject to scheduling availability. <br />4. Quote valid for thirty (30) days. CPE reserves the rightto revise our quotation as necessary. <br />S. Should HKA be the acting consultant/Inspectors on behalf of the Agency, CPE reserves the right to withdraw our bid. <br />CPEis pleased topmvide this esilmateforthe hitended use ofthe Cenhwclnrtofurnish laborand/or material in striet accord.ince with the plans and specifreatlons ay follows: <br />Ite <br />Ne <br />9 <br />Descrtpt"' ° v t rwiz ":� <br />3 3 7 ?,:< q i..,,S 4.�t <br />JOM. <br />�'.? <br />SY <br />RR <br />�", ...(x.., <br />150 <br />;Unit Pr cep <br />,.,a o+� n.> <br />100.00 <br />s $ <br />x;.r.e".t <br />15,000.00 <br />6 <br />Furnish and Install 2" PVC conduit and stub -out <br />LF <br />per plan <br />16A <br />Furnish and install type E traffic loop detector <br />EA <br />29 <br />265.00 <br />7,685.00 <br />(with DLC) <br />16B <br />Furnish and Install type D traffic loop detector <br />EA <br />13 <br />275.00 <br />3,575.00 <br />(with DLC) <br />16C <br />Furnish and Install type Q traffic loop detector <br />EA <br />7 <br />300.00 <br />2,100.00 <br />(with DLC) <br />Exclusions: Bond & Bond Premium; Overtime and/or Nighttime Rates; All Permits; All Training Requirements; Signage; Lane Closure Request, Traffic <br />Control, and TCP; Light Towers; CMS boards; Shoring; Water; Sidewalk & Surface Concrete; Regulatory Signs; Hauling Dirt, Debris, & Concrete <br />Foundation Away; Handicap Ramps; Repaving Street; Repaving Potholes; Saw Cutting; USA Marking Removals; Irrigation Work; Dewatering; Striping; <br />Survey; Fencing; Cold/Hot Mix; Temp. Asphalt; Inspection Fees; Testing; Temporary Loops; Temporary Signal; Compaction Testing, and/or High <br />Voltage Line Conflicts, Unless Otherwise Noted Above. Standard Certificate of Insurance will be provided upon request. Any additional requirements <br />will be billed at cost. <br />Hot Mix Asphalt shall be provided by Contractor to CPE to backfill any potholes and/or excavations. If it is not provided and we utilize temporary Cold <br />Mix, CPE will not be held liable for any claims that may derive from such pothole and/or excavated location, <br />Terms: Unless other arrangements are made, payment Is due & payable wlthinin 30 days upon completion; 1.5% monthly Interest will apply <br />thereafter. Bid based on entire bill of material and services and Is Inseparable unless written authorization Is provided by CPE. <br />Acceptance TOTAL: $28r360.00 <br />Ph: (626) 810-1338 J Fx: (626) 810-1322 1 Email: estlmatinq(n)cpengineeringinC,Com <br />