My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - BUDGET REALLOCATION FOR FLOWER BIKEWAY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
08/18/2020
>
23A - BUDGET REALLOCATION FOR FLOWER BIKEWAY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2020 5:01:40 PM
Creation date
8/13/2020 4:36:36 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
8/18/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Page 2 <br />Flower <br />Street Bikeway (17-6897 (HSIPL 5063(187))), bidding on May 27, 2020 2:00 PM <br />(Pacific) <br />Printed 06/09/2020 <br />Bid Results <br />Type <br />Item Code UOM <br />Oty <br />Unit Price <br />Line Total Comment <br />4 <br />GTT Opticom EVP System at Edinger &Flower <br />LS <br />1 <br />$10,689.00 <br />$10,689.00 <br />5 <br />Install 2" PVC per plan <br />LF <br />470 <br />$32.00 <br />$15,040.00 <br />6 <br />Install 3" PVC per plan <br />LF <br />225 <br />$40.00 <br />$9,000.00 <br />7 <br />Install 4" PVC per plan <br />LF <br />580 <br />$60.00 <br />$34,800.00 <br />8 <br />No. 6 Pullbox <br />EA <br />10 <br />$692.00 <br />$6,920.00 <br />9 <br />No. 6E Pullbox <br />EA <br />2 <br />$868.00 <br />$1,736.00 <br />10 <br />Install Video Detection System at Edinger Ave & Flower St <br />LS <br />1 <br />$33,337.00 <br />$33,337.00 <br />11 <br />Install Video Detection System atMcFadden Ave & Flower St <br />LS <br />1 <br />$33,337.00 <br />$33,337.00 <br />12 <br />24 Strand SMFO Cable <br />LF <br />3150 <br />$2.20 <br />$6,930.00 <br />13 <br />Fusion Splice 1 Strand SMFO <br />EA <br />48 <br />$35.00 <br />$1,680.00 <br />14 <br />IP Communication System at McFadden Ave & Flower St <br />LS <br />1 <br />$16,000.00 <br />$16,000.00 <br />15 <br />Construct ADA Curb Ramp Per Plan <br />SF <br />300 <br />$47.00 <br />$14,100.00 <br />16 <br />Pothole For Utility Not Shown on Plan <br />EA <br />10 <br />$1,115.00 <br />$11,150.00 <br />17 <br />Pothole For Utility for Traffic Signal Pole Locations <br />EA <br />8 <br />$875.00 <br />$7,000.00 <br />18 <br />Unclassified Excavation <br />CY <br />10 <br />$1,116.00 <br />$11,160.00 <br />19 <br />Temporary Overhead Wiring at Edinger Ave & Flower St <br />LS <br />1 <br />$7,600.00 <br />$7,600.00 <br />P12,rn6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.