My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - BUDGET REALLOCATION FOR FLOWER BIKEWAY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
08/18/2020
>
23A - BUDGET REALLOCATION FOR FLOWER BIKEWAY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2020 5:01:40 PM
Creation date
8/13/2020 4:36:36 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
8/18/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Flower Street Bikeway (17-6897 (HSIPL 5063(187))), <br />bidding on May 27, 2020 2:00 PM <br />(Pacific) <br />Bid Results <br />Type Item Code <br />UOM <br />Oty <br />Unit Price <br />20 Temporary Overhead Wiring at McFadden Ave & Flower St <br />LS <br />1 <br />$5,500.00 <br />21 Install Type "Q" Bike Loop <br />EA <br />13 <br />$285.00 <br />22 Install Type "E" & Type "D" Bike Loop <br />EA <br />120 <br />$257.00 <br />23 Signing and Striping <br />LS <br />1 <br />$173,573.00 <br />24 Labor Agreement Oversight <br />LS <br />1 <br />$10,000.00 <br />Subtotal <br />Total <br />Page 3 <br />Printed 06/09/2020 <br />Line Total Comment <br />$5,500.00 <br />$3,705.00 <br />$30,840.00 <br />$173,573.00 <br />$10,000.00 <br />$711,682.00 <br />$711,682.00 <br />P,2&un 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.