Laserfiche WebLink
City of hams Ana -The Bowery <br />May 11, 2020 <br />Page 21428 <br />equilibrium." (Environmental Council of Sacramento v. Gty of Sacramento (2006) 142 <br />Cal. App. 4th 1018,1039.) <br />The Project Is Required to AdoptAddataonal FearabA Maiaga3aon Measures <br />to MitsgaPian Construe#on Emissions <br />According to Mr. Hagemann and Dr. Rosenfeld, the following feasible <br />mitigation measures should also be considered and implemented to alleviate the <br />significant impact of construction -related emissions for the Project: <br />• Diesel Control Measures recommended by the Northeast Diesel <br />Collaborative (NEDC); <br />• Repowering or replacing older construction equipment engines; <br />• Installation of retrofit devices on existing construction equipment; <br />• Use of electric and hybrid construction equipment; <br />• Implementation of a construction vehicle tracking system; and <br />• Use of spray equipment with greater transfer efficiencies. <br />(Hagemann at 14-19) <br />2. The Project is Required to Adopt Feasible Additional Mitsgation Measures to <br />Mitigate QperationalEvm..rsions <br />Second, the Project DI�,IR estimated the annual GHG emissions to be 9,861.60 <br />megatons per year (MT CO2e/year), which far exceeds the S(:AQK,11) "Tier 3 mixed - <br />use threshold of 3,000 MT CO2e/year. (llagemann at 14.) in order to mitigate this <br />impact, the Project merely proposes implementing sustainable design features under <br />Title 24/CalG== standards but much more can and should be considered for the <br />Project. following mitigation measures for GHG emissions are feasible but were not <br />considered or implemented for the Project, including: <br />Integrate affordable and below market rate housing; <br />16iergry-related mitigation_ <br />Install programmable thcnnostal. timers;. <br />Establish ousite renewable cnergy systems, including solar power <br />and wind power; <br />23 <br />24 <br />75C-141 <br />