Laserfiche WebLink
a Require use of electric or a lternativelyfueled sweepers with HE PA filters. <br />o Include energy storage where appropriate to optimize renewable energy generation <br />systems and avoid peak energy use. <br />o Prohibit gas powered landscapeequipment and implement electric yard equipment <br />compatibility <br />• Transportation -related mitigation: <br />o Provide EV parking <br />o Require residential area parking permits <br />o Implement nde-sharin& vanpool, shuttle, bike -sharing programs <br />o Provide bike parking near transit <br />o Provide local shuttles <br />o Implement area or cordon pricing <br />o Install a park -and -ride lot <br />• Water -related mitigation: <br />o Install an infiltration basin to provide an opportunity for 100%of the storm water to <br />infiltrate on -site. <br />o Install a system to reutilize gray water <br />o Use locally -sourced water supply <br />o Plant native and drought- resistant trees and vegetation <br />• Develop and follow "green streets guide" that requires: <br />o Use of minimal amounts of concrete and asphalt; <br />o Use of groundcovers rather than pavement to reduce heat reflection."t <br />• Implement Project design features such as: <br />o Shade HVAC equipment from direct sunlight; <br />o Install high-albedo white thermoplastic polyolefin roof membrane; <br />o Install formaldehyde -free insulation; and <br />o Use recycled -content gypsum board. <br />o Require all buildings to become "LEER' and "WELL" certified. <br />• Plant low-VOC emitting shade trees, e.g., in parking lots to reduce evaporative emissions from <br />parked vehicles. <br />Finally, the Kimball Business Park Project Final Environmental Impact Report includes various feasible <br />mitigation measures that would reduce on -site area emissions that are applicable to the proposed <br />Project's retail land use, and include, but are notlimited to:5' <br />• Increase in insulation such that heat ransfer and thermal bridging is minimized. <br />• limit air leakage through the structure and/or within the heating and cooling distribution <br />system. <br />° Cod Houston Plan: <br />httn /lwww hnrrrPsmrch nrekitcs/do( nit/filxldreumantc/nrrnPras/r-nnlHnu¢tnnPUn n ndf <br />SPMitigation Monitoring Plan for the Kimball Business Park Project Final Environmental Impact Report, July 2016. <br />20 <br />44 <br />75C-188 <br />