Laserfiche WebLink
• Installation of dual -paned or other energy efficient windows. <br />• Installation of automatic devices to turnoff lights wherethey are not needed_ <br />These measures offer cost-effective, feasible way to incorporate lower -emitting design features into <br />the proposed Project, which subsequently, reduces emissions released during Project operation. An <br />updated EIH should be prepared to include add itionaI mitigation measures, as well as include an <br />updated air quality analysis to ensure that the necessary mitigation measures are implemented to <br />reduce emissions to below thresholds. The Up. also needs to demonstrate commitment to the <br />implementation of these measures prior to Projectapproval, to ensure that the Project's significant <br />emissions are reduced to the maximum extent possible. <br />SWAPS has received limited discovery regardingthis project. Additional information may become <br />available in the future; thus, we retain the right to revise or amend this report when additional <br />information becomes available. Our professional services have been performed using that degree of <br />care and skill ordinarily exercised, under similar circumstances, by reputable environmental can sultarics <br />practicing in this or similar localities at the time of service. No other warranty, expressed or implied, is <br />made as to the scope of work, work methodologies and protocols, site conditions, analytical testing <br />results, and findings presented. This report reflects efforts which were limited to information that was <br />reasonably accessible at the time of the work, and may contain informational gaps, inconsistencies, or <br />otherwise be incomplete due tot he unavai lability a runcertainty of information obtained or provided by <br />third parties. <br />Sincerely, <br />- <br />Matt Hagemann, P.G., CHg. <br />Paul E. Rosenfeld, Ph.D. <br />zt <br />44 <br />45 <br />75C-189 <br />