My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75C - PH - THE BOWERY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
08/18/2020
>
75C - PH - THE BOWERY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2020 5:10:27 PM
Creation date
8/13/2020 4:53:25 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75C
Date
8/18/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1021
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 5, 2020 <br />Engineers&Planners <br />Traffic <br />Transportation <br />Mr. Jeremy Ogulnick <br />Parking <br />RHW Holdings, LLC <br />240 Newport Center Drive, Suite 200 <br />p <br />a span, E & <br />Greenspan, <br />Greenspan, Engineers <br />Newport Beach, CA 92660 <br />2 Executive Circle <br />Suite 250 <br />LLG Reference: 2.20.4274.1 <br />INine,CA9261a <br />999.825.6175 T <br />Subject: Parking Study and Parking Management Plan for the <br />949.825.6173 <br />The Bowery <br />vaww.11gengineers.com <br />Santa Ana, California <br />Pasadena <br />Irvine <br />San Diego <br />Dear Mr. Ogulnick: <br />woodland Hills <br />As requested, Linscott, Law & Greenspan, Engineers (LLG) is pleased to submit this <br />Parking Study for the proposed The Bowery Project (hereinafter referred to as <br />Project) in the City of Santa Ana, California. The Bowery Project is a proposed <br />mixed -use residential apartment project consisting of 1,100 apartment units with <br />80,000 SF of retail/commercial space to be located south of Warner Avenue and west <br />of Red Hill Avenue in the City of Santa Ana, California. <br />It is our understanding that a parking study is needed to validate the parking demand <br />and adequacy of proposed parking supply for the retail/commercial portion of the <br />Project as well as the proposed parking supply of the Project's residential component <br />in comparison to the City requirements as outlined in Article AY — Off -Street Parking <br />of the Municipal Code. <br />Pursuant to our coordination efforts, prior work experience on similar projects, and <br />understanding of the City of Santa Ana requirements, the preparation of a Parking <br />Study, inclusive of a Parking Management Plan (PMP) is required to ensure adequate <br />parking for all Project tenants, employees and guests, and reduce or eliminate any <br />parking intrusion on the adjacent commercial properties. This PMP is intended to be <br />used to ensure that the Project's parking supply will be sufficient to accommodate the <br />Philip M. Unseen, PE 092430601 <br />actual parking demand for both the Project's retail/commercial component as well as <br />Jack M. Greenspan, PE mm.l <br />the Project's residential component. <br />William A. Law, PE IRe4 <br />Paul w.Wilkinson, PE <br />John P. Keating, PE <br />David S. Shedder, PE <br />John A. Boorman, PE <br />Clare M. Look -Jaeger, PE <br />Richard E. Barrens. PE <br />Kea D. Maaerry, PE <br />hW20012204274-Th,B -.,. Sams Aw'.R,,.-M274 The Br -R,N-d Pn75i�l583 m.r".in d303-G020 duce <br />v <br />An IGPNB Company Founded 1966 <br />
The URL can be used to link to this page
Your browser does not support the video tag.