|
Table 20: Industrial Prototype Operations Economic Impact
<br />Economic Impact of Industrial Prototype Operations
<br />City
<br />of Santa Ana
<br />Impact
<br />Employment
<br />Labor Income
<br />Value Added
<br />Output
<br />Direct
<br />608
<br />$65,100,000
<br />$92,300,000
<br />$149,000,000
<br />Indirect
<br />29
<br />$2,000,000
<br />$2,800,00
<br />$4,180,000
<br />Induced
<br />2
<br />$107,000
<br />$200,000
<br />$330,000
<br />Total
<br />638
<br />$67,200,000
<br />$95,300,000
<br />$153,500,000
<br />Remainder of Orange County
<br />Impact
<br />Employment
<br />Labor Income
<br />Value Added
<br />Output
<br />Direct
<br />N/A
<br />N/A
<br />N/A
<br />N/A
<br />Indirect
<br />390
<br />$27,700,000
<br />$42,000,000
<br />$62,830,000
<br />Induced
<br />383
<br />$21,000,000
<br />$39,000,000
<br />$60,900,000
<br />Total
<br />773
<br />$48,790,000
<br />$81,000,000
<br />$123,740,000
<br />Total CountVwide
<br />1,411
<br />$116,000,000
<br />$176,200,000
<br />$277,000,000
<br />Note: Numbers are rounded and may not sum
<br />Source: IMFLAN, BLS, California DOF, AECOM
<br />For ongoing operations of the Industrial Prototype, IMPLAN estimates that the direct, indirect, and induced impacts of
<br />construction would annually support approximately 1,411 jobs and generate over $277 million of total economic
<br />output for Orange County, with 638 jobs and over $153 million in economic output occurring within the City of Santa
<br />Ana.
<br />AECOM assumed industrial operations at buildout would include a mix of engineering, professional/technical
<br />services, research and development, and wholesale trade. AECOM assumed the Project's 320,000 SF of industrial
<br />space could support approximately 608 employees at structural occupancy (500 SF/employee).
<br />The Industrial Prototype would be estimated to generate more employment and economic output than the equivalent
<br />factors for the Project. Sectors utilizing this space have significant potential to add value to a local economy beyond
<br />what is measurable in taxable sales on site.
<br />75C-652
<br />
|