My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE - 75C
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
08/18/2020
>
CORRESPONDENCE - 75C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2020 3:38:45 PM
Creation date
8/14/2020 11:38:39 AM
Metadata
Fields
Template:
City Clerk
Date
8/18/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Jerry Guevara <br />The Bowery Project DEIR <br />February 5, 2020 <br />Page 4 <br />14. Tustin Ranch Road and Warner Avenue North: For City of Tustin locations where the <br />intersection capacity utilization (ICU) is greater than the acceptable level of service (i.e., LOS <br />E or ICU is greater than .90), mitigation of the project contribution is required to bring the <br />intersection back to no -project conditions or better if the project contribution is greater <br />than .02 or greater at non -Congestion Management Program (CMP) locations. Therefore, <br />this intersection is not considered adversely impacted by the proposed project. The DEIR <br />indicates that the intersection is adversely impacted and should be revised. <br />15. Project feature of a new signal at Driveway 1/Warner Avenue intersection: Due to its <br />proximity to the Red Hill Avenue and Warner Avenue signalized intersection maintained by <br />the City of Tustin, it is expected that the proposed new signal at Driveway 1/Warner Avenue <br />be also maintained by the City of Tustin. The Project shall be required to collaborate with <br />the City of Tustin in its design and construction. <br />16. Future Project of a Class II Bicycle Facility on Warner Avenue: The proposed project shall be <br />required to collaborate on the proposed joint Santa Ana/Tustin project to add a Class II Bike <br />Lane on Warner Avenue on the northern boundary of the Project, with the City of Santa Ana <br />as the lead. <br />17. The through traffic volumes on Warner Avenue west of Red Hill Avenue decrease <br />significantly to/from the Red Hill Avenue and Warner Avenue intersection, which may <br />underestimate the project impact at the proposed signalized project driveway on Warner <br />Avenue. Please provide an explanation of the decreased through traffic volumes. <br />18. In Tables 8 and 12, please correct the level of service (LOS) for Intersection 22 — Red Hill <br />Avenue at Edinger Avenue to LOS D in the PM peak hour. <br />Thank you again for the opportunity to provide comments on the proposed project. The City of Tustin <br />would appreciate receiving early responses to our comments as well as a copy of the Final EIR when it <br />becomes available and all future public hearing notices with respect to this project. Please provide all <br />future CEQA notices regarding this project to the undersigned pursuant to Public Resources Code Section <br />21092.2. <br />If you have any questions regarding the City's comments, please call Scott Reekstin, Principal Planner, at <br />(714) 573-3016 or Krys Saldivar, Public Works Manager, at (714) 573-3172. <br />Sincerely, <br />Elizabeth A. Binsack <br />Community Development Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.