Laserfiche WebLink
EXHIBIT A <br />Appendix <br />ATTACHMENT 1 <br />SCOPE OF WORK <br />CITY OF SANTA ANA <br />REQUEST FOR PROPOSALS <br />FOR <br />ELECTRICAL LIGHTING DESIGN SERVICES <br />FOR CIVIC CENTER PERIMETER LIGHTING <br />RFP NO.: 20-026 <br />Introduction and BackEround: <br />The existing lighting systems to be replaced by this project are approximately 50 years old with <br />replacement parts that have become increasingly challenging to procure. Currently, the lights <br />around the perimeter consists of various lighting fixtures ranging from "globe" to Double King to <br />Edison street light attached to power poles. Furthermore, the current lighting system does not <br />provide full light coverage on both sides of the streets. The City desires to install new energy <br />efficient LED fixtures that will provide improved illumination as well as the Civic Center Super <br />Block signature look. A layout of existing lights around the perimeter is included in Appendix 4. <br />The City is accepting proposals from experienced sums to provide their professional engineering <br />expertise with experience and deep understanding of modem day lighting for the civic center. The <br />scope of work shall include the preparation of construction plans, specifications, and cost estimates <br />(PS&E) with the following conditions, including, but not limited to: <br />• Lights for the perimeter shall be analyzed on both sides of the street <br />• All existing light pole fixtures shall be removed and filled or repaired to match adjacent <br />surface, except for active power poles <br />• Lights for the Civic Center Super Block shall be different from the rest of Santa Ana <br />downtown light theme, which are currently Double King light standards. <br />• Design for sustainability, needs, and budget. <br />Consultant Responsibilities: <br />The Consultant's responsibilities include the following: <br />Task 1: Project Coordination <br />The Consultant shall be fully responsible for the overall management and coordination for the project, <br />which may include, but is not limited to project development team meetings, liaison with affected <br />agencies, and utility companies. Prepare progress report and schedule, securing permits for all field <br />studies and any other required permits from other agencies. <br />Task 2: Preliminary Engineering <br />Preliminary Engineering shall include Kick-off meeting with City Staff to discuss scope of work, <br />project required tasks and objectives, potential elements and issues, and schedule. Preliminary <br />Engineering will also include field work and subsequent meetings with City staff as required for <br />preparation of site plans. <br />City of 2Acqa12 20-026 <br />Al-1 <br />