My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - CIVIC CENTER LIGHTING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
09/01/2020
>
25C - CIVIC CENTER LIGHTING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2020 1:23:11 PM
Creation date
8/27/2020 4:37:46 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25C
Date
9/1/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSAL <br />Electrical Lighting Design Services for Civic Center Perimeter Lighting <br />RFP No.20-026 <br />Project Approach <br />Our mission at IDS is to deliver a quality project to our clients. To achieve <br />this goal, a carefully thought out plan, in which both client and IDS agree <br />on the project scope and an approach that will result in a successful <br />project. <br />The following is a step by step approach that was outlined in the City of <br />Santa Ana's RFP and that IDS has implemented on many successful <br />projects as well: <br />Task 1: Project Coordination <br />IDS shall be fully responsible forthe overall management and coordination <br />forthe project, which may include, but is not limited to project development <br />team meetings, liaison with affected agencies, and utility companies. IDS <br />will prepare progress reports and schedules, secure permits for all field <br />studies and any other required permits from applicable agencies. <br />Task 2: Preliminary Engineering <br />Streetlight along Santa Ana Boulevard — <br />Typical style around perimeter <br />Preliminary Engineering shall include Kick-off meeting with City Staff to <br />discuss scope of work, project required tasks and objectives, potential elements and issues, and schedule. <br />Preliminary Engineering will also include field work and subsequent <br />meetings with City staff as required for preparation of site plans. <br />Project required tasks include, but may not be limited to: <br />• Analyze, survey and map the existing light inventory around the <br />perimeter. <br />• Identify and map the locations where all of the above ground <br />equipment and light standards will be installed. <br />• Identify where all the underground utilities are located within the <br />project scope to eliminate field conflicts. <br />• Make recommendations of light product options and their rough <br />probable costs for City's consideration and selection. <br />• Analyze the design options, so that City may be able to replace/install <br />the lights in phases if necessary. <br />• Coordinate with City and County of Orange to ensure lights are <br />placed at the desire locations to better serve the Civic Center Super <br />Block. <br />Pedestrian scale lighting pole with streetlight <br />pole along Broadway <br />• Coordinate with Southern California Edison on lights attached to power poles, power source, meter(s), <br />etc. <br />Task 3: Design Development (30% plans) <br />Design development will involve the development of electrical system improvements for the Civic Center <br />perimeter lighting as outlined in the preliminary engineering phase to address project required tasks and <br />shall include preliminary electrical engineering plans and cost estimate. <br />AA IDS GROUP Page s <br />25C-26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.