My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - CIVIC CENTER LIGHTING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
09/01/2020
>
25C - CIVIC CENTER LIGHTING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2020 1:23:11 PM
Creation date
8/27/2020 4:37:46 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25C
Date
9/1/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSAL <br />Electrical Lighting Design Services for Civic Center Perimeter Lighting <br />RFP No.20-026 <br />Task 5: Bid Advertisement, Construction Administration, Record Drawings: <br />If requested, IDS shall provide support during bid advertisement and construction, and provide record <br />drawings as described below. <br />Bid Advertisement: If requested, IDS shall: <br />• Respond to written Requests for Information (RFI) to provide clarification or resolve discrepancies in <br />the contract documents. Responses shall be completed within three (3) working days. <br />• Review addenda. <br />• Attend pre -bid meeting. <br />Construction Support: All construction support work shall be at the request of and coordinated by the City <br />of Santa Ana. As requested, IDS shall: <br />• Attend the pre -construction meeting. <br />• Review and approve submittals, as requested. If requested, IDS shall complete submittal reviews <br />within 48 hours of receipt. <br />• Provide periodic field reviews and bring to the attention of the City of Santa Ana any defects or <br />deficiencies in the work by the construction contractor which the Consultant may observe. <br />• Be available as requested by the City to resolve discrepancies in the contract documents. IDS shall <br />bring to the attention of the City any defects or deficiencies in the work by the construction contractor <br />which the Consultant may observe. IDS shall have no authority to issue instruction on behalf of the <br />City, or to deputize another to do so. <br />• Furnish, at IDS's sole cost and expense, all necessary drawings for corrections and change orders <br />required by errors and omissions of IDS. Electronic files for the change orders shall be submitted to <br />the city for duplication and distribution. <br />Record Drawings / As -Built Plans: Upon completion of construction, the record drawings kept by the <br />General Contractor shall be turned over to IDS for preparation of "as -built" plans. IDS shall incorporate all <br />changes to the plans electronically with all necessary revision notations. Once plans have been updated, <br />an electronic file shall be submitted to the City in MicroStation CADD and pdf formats of the final as -built <br />drawings via CD, e-mail, or through an FTP site. <br />City Responsibilities <br />The City will be responsible for the following items: <br />• Providing electronic topographic site plans as shown in Appendix, Attachment 4 of the RFP <br />• Furnishing electronic design file with City title block and title sheet (24" x 36") <br />• Providing standard City boilerplate specification <br />• Providing support with the coordination between City and County of Orange. <br />• Acting as a liaison with the appropriate decision making bodies, as necessary <br />• Providing standard invoice template <br />• Reviewing and commenting on the PS&E package within four (4) weeks of receipt of each completed <br />milestone PS&E package <br />�� I DS GROUP Page 8 <br />25C-28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.