Laserfiche WebLink
BEWLEY STREET TOWNHOMES PROJECT <br />Final Initial Study/Mitigated Negative Declaration <br />Table 1 <br />Mitigation Monitoring and Reporting Checklist <br />Mitigation <br />Mitigation Measure <br />Implementation <br />Implementation <br />Monitoring <br />Monitoring <br />Verification of Compliance <br />Initials Date <br />Remarks <br />Number <br />Responsibility <br />Timing <br />Responsibility <br />Timing <br />BIOLOGICAL RESOURCES <br />If ground -disturbing activities or <br />removal of any trees, shrubs, or any <br />other potential nesting habitat are <br />scheduled within the avian nesting <br />season (generally from February 1 <br />through August 31), a pre -construction <br />clearance survey for nesting birds <br />shall be conducted within three days <br />prior to any ground disturbing <br />activities. <br />The biologist conducting the clearance <br />Qualified <br />Three Days <br />City Santa <br />Three Days <br />survey shall document the negative <br />Biologist/ <br />Prior to <br />P l anning <br />Ana Planning <br />Prior to <br />BIO-1 <br />results 9 no active bird nests are <br />Construction <br />Construction/ <br />and Building <br />Construction/ <br />observed on the project site during the <br />Contractor <br />During <br />Agency <br />During <br />clearance survey with a brief letter <br />Construction <br />Construction <br />report indicating that no impacts to <br />active bird nests would occur before <br />construction can proceed. If an active <br />avian nest is discovered during the <br />pre -construction clearance survey, <br />construction activities shall stay <br />outside of a 300-foot buffer around the <br />active nest. For raptor species, this <br />buffer shall be 500 feet. A biological <br />monitor shall be present to delineate <br />the boundaries of the buffer area and <br />June 2020 4-3 Mitigation Monitoring and Reporting Program <br />75A-64 <br />