My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH BEWLEY STREET
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
09/01/2020
>
75A - PH BEWLEY STREET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2020 4:06:43 PM
Creation date
8/27/2020 4:37:48 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75A
Date
9/1/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BEWLEY STREET TOWNHOMES PROJECT <br />Final Initial Study/Mitigated Negative Declaration <br />Table 1 <br />Mitigation Monitoring and Reporting Checklist <br />Mitigation <br />Mitigation Measure <br />Implementation <br />Implementation <br />Monitoring <br />Monitoring <br />Verification of Compliance <br />Initials Date <br />Remarks <br />Number <br />Responsibility <br />Timing <br />Responsibility <br />Timing <br />BIOLOGICAL RESOURCES <br />If ground -disturbing activities or <br />removal of any trees, shrubs, or any <br />other potential nesting habitat are <br />scheduled within the avian nesting <br />season (generally from February 1 <br />through August 31), a pre -construction <br />clearance survey for nesting birds <br />shall be conducted within three days <br />prior to any ground disturbing <br />activities. <br />The biologist conducting the clearance <br />Qualified <br />Three Days <br />City Santa <br />Three Days <br />survey shall document the negative <br />Biologist/ <br />Prior to <br />P l anning <br />Ana Planning <br />Prior to <br />BIO-1 <br />results 9 no active bird nests are <br />Construction <br />Construction/ <br />and Building <br />Construction/ <br />observed on the project site during the <br />Contractor <br />During <br />Agency <br />During <br />clearance survey with a brief letter <br />Construction <br />Construction <br />report indicating that no impacts to <br />active bird nests would occur before <br />construction can proceed. If an active <br />avian nest is discovered during the <br />pre -construction clearance survey, <br />construction activities shall stay <br />outside of a 300-foot buffer around the <br />active nest. For raptor species, this <br />buffer shall be 500 feet. A biological <br />monitor shall be present to delineate <br />the boundaries of the buffer area and <br />June 2020 4-3 Mitigation Monitoring and Reporting Program <br />75A-64 <br />
The URL can be used to link to this page
Your browser does not support the video tag.