My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH BEWLEY STREET
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
09/01/2020
>
75A - PH BEWLEY STREET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2020 4:06:43 PM
Creation date
8/27/2020 4:37:48 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75A
Date
9/1/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BEWLEY STREET TOWNHOMES PROJECT <br />rat Initial Study/Mitigated Negative Declaration <br />mitigation <br />Mitigation Measure <br />Implementation <br />Implementation <br />Monitoring <br />Monitoring <br />Verification of Compliance <br />the paving control plan shall stipulate <br />that static (non -vibratory) rollers be <br />used, as an alternative to vibratory <br />rollers, within 20 feet of the northern <br />and southern residences (Assessors <br />Parcel Number [APN] 938-700-52 <br />through -67 and 198-101-08)located <br />approximately 16 feet to the north and <br />18 feet to the south, respectively. <br />Vibratory roller operations shall be <br />prohibited within 20 feet of APN 938- <br />700-52through -67 and 198-101-08. <br />TRIBAL CULTURAL RESOURCES <br />Prior to the issuance of any permits for <br />_ <br />initial site clearing (such as pavement <br />removal, grubbing, tree removals) or <br />issuance of permits allowing ground <br />Prior to <br />disturbing activities that cause <br />Issuance of <br />excavation to depths greater than <br />IssuaPrior nce <br />Permits for <br />Permits f <br />artificial fill (including boring, grading, <br />Permits for <br />Permits for <br />Initial Site <br />excavation, drilling, potholing or <br />Project <br />Initial Site <br />Clearing/ <br />auguring, and trenching), the City of <br />Applicant/ <br />Clearing/ During <br />City of Santa <br />During <br />Santa Ana shall ensure that the project <br />Qualified Native <br />Ground- <br />Ana Planning <br />Ground - <br />TCR-1 <br />applicant/developer retain qualified <br />American <br />Disturbing <br />and Building <br />Disturbing <br />Native American Monitor(s). The <br />Monitor(s)/ <br />Activities That <br />Agency <br />Activities That <br />Monitor(s) shall be approved by the <br />construction <br />Cause <br />Cause <br />tribal representatives of the Gabrieleno <br />Contractor <br />Excavation to <br />Excavation to <br />Band of Mission Indians — Kizh Nation <br />Depths Greater <br />Depths <br />and be present on -site during initial <br />t han Artificial Fill <br />Greater than <br />site clearing and construction that <br />Artificial Fill <br />involves ground disturbing activities <br />that cause excavation to depths <br />greater than artificial fill. <br />June 2020 4-6 Mitigation Monitoring and Reporting Program <br />75A-67 <br />
The URL can be used to link to this page
Your browser does not support the video tag.