Laserfiche WebLink
BEWLEY STREET TOWNHOMES PROJECT <br />Final Initial Study/Mitigated Negative Declaration <br />Mitigation <br />I Mitigation Measure <br />Implementation <br />Implementation <br />Monitoring <br />Monitoring <br />Verification of Compliance <br />project owner and City of Santa Ana to <br />implement Native American <br />consultation procedures. <br />GEOLOGY AND SOILS <br />If evidence of subsurface <br />paleontological resources is found <br />during construction, excavation and <br />other construction activity in that area <br />shall cease and the construction <br />contractor shall contact the City of <br />Santa Ana Planning and Building <br />Agency Director. With direction from <br />Qualified <br />City of Santa <br />the Planning and Building Agency <br />Paleontologist/ <br />During <br />Ana Planning <br />During <br />GEO-1 <br />Director, a qualified paleontologist <br />Construction <br />Construction <br />and Building <br />Construction <br />certified by the County of Orange shall <br />Contractor <br />Agency <br />evaluate the find prior to resuming <br />grading in the immediate vicinity of the <br />find. If warranted, the qualified <br />paleontologist shall prepare and <br />complete a standard Paleontological <br />Resources Mitigation Program for the <br />salvage and curation of the identified <br />resource(s). <br />NOISE <br />Prior to issuance of a grading permit, <br />the Applicant shall prepare a paving <br />control plan to ensure that the paving <br />Prior To <br />Prior To <br />construction phase does not result in <br />Project <br />Issuance of a <br />City of Santa <br />Issuance of a <br />NOW <br />damage to existing residences to the <br />damage <br />Applicant/ <br />GraPermit/ <br />Ana Planning <br />Grading <br />and south of the site. The <br />Construction <br />During <br />i <br />and Building <br />Permit/ <br />paving control plan shall be subject to <br />Contractor <br />Construction <br />Agency <br />Agency <br />During <br />the City of Santa Ana Planning and <br />Construction <br />Building Agency's approval. To <br />reduce groundborne vibration levels, <br />June 2020 45 Mitigation Monitoring and Reporting Program <br />75A-66 <br />