My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25D - AGMTS FOR SUBSURFACE IMAGING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
09/15/2020
>
25D - AGMTS FOR SUBSURFACE IMAGING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 5:12:04 PM
Creation date
9/10/2020 4:44:55 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25D
Date
9/15/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
material <br />c. Horizontal location referenced to the provided datum and or as requested by the Engineer <br />d. Obtain pipe, duct bank, encasement, and multi- conduit configuration width (outside <br />diameter) <br />e. Provide utility structure material composition and condition <br />f Identify benchmarks used to determine elevations and include it as part of the final <br />deliverable report. <br />g. Identify and provide pavement thickness, material and condition and soil type <br />characteristics. <br />• All completed reports shall be certified to be correct and signed by a professional land surveyor <br />registered in California. (Only if required by the Engineer). Work under this category will be paid <br />on hourly basis. <br />• Backfill all test holes shall be backfilled with in -kind material and compact to a relative <br />compaction of 90%. <br />• Boreholes greater than 211:2 shall be paved and match existing pavement thickness section unless <br />stated otherwise and or approved by the Engineer. <br />• Clean and sweep work site at the end of the work day. <br />• Provide additional surveying, and underground utility mapping services at an hourly rate <br />General Requirements and Proiect Deliverables: <br />• All work for this work for traffic control shall be done in accordance with the Federal Highway <br />Administration's Manual (MUTCD) <br />• The selected firm/s shall obtain all necessary permits from the City and local jurisdiction prior to <br />commencing any of the work in Public Right of Way. <br />• Any work required on private property shall be authorized by the Engineer prior to commencement <br />of work. <br />• All work shall be done in accordance with ASCE Standard 38-02; Standard Guideline for the <br />collection and depiction of the existing subsurface utility data. <br />• The firm/s shall secure all permits to work in the City. These fees are not reimbursable. <br />• All work shall be performed to the specific project and or location as detailed in the notice to proceed <br />and indicated by the Engineer. <br />• All reports and technical memoranda shall be submitted electronically to City and shall include all <br />the information as required and detailed in the notice to proceed. All Computer Aided Drafting <br />Design (CADD) work shall be submitted on electronic format (Microstation). In addition, a hard copy <br />of the project findings and a digital file in Microstation shall be submitted to the engineer for review <br />before final approval and final payment is authorized. <br />A list of positions and hourly rates shall be included as part of the proposal and included in the <br />seal bid package. See Attachment 4 — ADDITIONAL PROVISIONS for a sample breakdown. <br />The consulting firm/s are responsible for any damage to utilities during the locating efforts. <br />Consultant Responsibilities: <br />City of Sant9WFFOM060 <br />
The URL can be used to link to this page
Your browser does not support the video tag.