Laserfiche WebLink
As Project Manager, Shawn will manage the daily activities of the <br />project, enabling real-time project monitoring. He will liaise with the <br />City's Project Manager and communicate project status. Shawn has <br />over 27 years of experience managing projects in California and is <br />currently overseeing SUE services for the LACCD District -wide <br />Energy Efficiency/Utility Infrastructure project. For the past decade, <br />Shawn has managed multiple projects involving SUE including the following: <br />• LACCD, District -wide Energy Efficiency/Utility Infrastructure Project, CA <br />• LA County DPW, Rancho Los Amigos, Utility Locating, Los Angeles, CA <br />• SCWD, Lift Station No. 6 Force Main, Utility Locating, CA <br />• OCSD Newhope-Placentia Sewer Trunk Replacement SUE, Lee & Ro <br />• OCSD Rehabilitation of Western Regional Sewers, SUE, AECOM <br />• City of Long Beach — Municipal Urban Stormwater Treatment, Potholing, CA <br />Glen is experienced in all aspects of utility investigations including <br />research, mapping, field investigations, survey, design and <br />deliverable production. He has 16 years of civil engineering <br />expertise including due diligence, design and project management. <br />Glen specializes in SUE, land development, site design, water <br />quality management plans, road widening/rehabilitation, storm <br />drain/drainage, water/sewer facilities, signing/striping, retaining walls and traffic <br />handling for private and municipal agencies. His relevant experience includes: <br />• LACCD, District -wide Energy Efficiency/Utility Infrastructure Project, CA <br />• Metropolitan Water District, Iron Mountain Pumping Plant, Sablon, CA <br />• San Diego Gas & Electric, Granite Hills, CA <br />• Circle Way Storm Drain and Site Improvement, Laguna Beach, CA <br />• Nash Avenue Waterline Replacement, Downey, CA <br />SUE Manager Years of Experience: 8 with firm; 19 tot <br />Richard oversees Field Operations for SUE and utility coordination <br />projects for T2 throughout California, including permit acquisitions. <br />He has maintained contracts with the Los Angeles County <br />Department of Public Works, Port of Long Beach, Orange County <br />RMDM and Port of Los Angeles for utility investigations. Richard <br />has over 19 years of experience providing project management and <br />supervision on SUE and utility coordination projects throughout California. His <br />expertise is in all aspects of utility investigation including using various electronic <br />designating/sonding instruments (Radio -Detection, Seek -Tech, Metro -Tech and <br />multiple GPRs). <br />Kwo <br />1. STATE ALIFICATIONS 17 <br />