T2's team uses the following techniques to achieve schedule success: <br />• Assign Work Assignment Manager for individual assignments <br />• Initiate brainstorming meeting to discuss project requirements and <br />critical schedule path task items <br />• Prepare a Work Plan outlining all project requirements <br />• Communicate Work Plan and detailed schedule to team members <br />• Prepare a realistic schedule allowing time for unforeseen circumstances <br />• Schedule and host a Kick-off Meeting <br />• Schedule up -front meetings with utility companies/permitting agencies <br />• Hold regular production meetings <br />• Complete progress reporting <br />T2's approach to SUE investigations begins with a thorough site <br />reconnaissance. County records, Title Commitments, existing surveys, <br />oral recollection, maps and any available utility records provide the <br />foundational information our team will research to start the investigation. <br />Using this information, our team will work with the City to fine-tune the <br />scope, investigation limits and Quality Levels to match the existing site <br />conditions and proposed design. <br />Subsurface Utility Engineering (SUE) Approach <br />T2 professionals have extensive experience with quickly mobilizing <br />staff and equipment necessary for SUE and survey projects. With a <br />developed, proven and systematic project mobilization approach for open- <br />end type contracts, we can easily mobilize ("pools") resources from other <br />offices to complete projects with accelerated schedules. As with most as - <br />needed contracts, crews simultaneously work on multiple projects. We <br />schedule activities concurrently when feasible to expedite project completion. <br />While field services are completed, office operations will concurrently be <br />performed to allow staff to furnish the Test Hole Data Report and CADD files <br />as close to the completion of field operation as possible. Tasks include <br />converting survey data of designated utilities into CADD files, preparing Test <br />Hole Data Reports, scheduling and coordinating with utilities and surveyors. <br />Test Hole (Potholing) Services <br />T2 field technicians will perform air -vacuum excavation of test holes as <br />needed for the project on existing subsurface utilities requested by the <br />team. Test hole locations will be identified during the development of the <br />plans. Utility data obtained through our standard procedures includes the <br />depth, horizontal and vertical location tied to project datum performed by <br />the survey team, size and material composition of the utility exposed. <br />T2 staff have performed numerous SUE projects involving test hole <br />throughout the West and understand local agency requirements <br />and procedures. When a project task order is assigned, our field <br />supervisor will initially meet with an inspector to walk the project area <br />and determine the safest traffic control plan to complete the test holes. <br />T2 will submit traffic control plans for approval and will hire a barricade <br />firm from an approved vendor list to perform all traffic control including <br />an off -duty police officer, if needed. <br />Proactive communication <br />between the Contract/ <br />Project Managers, team <br />members and the City is <br />necessary for a successful <br />project outcome. <br />2. SCOPE AND SCHEDULE 115 <br />