Laserfiche WebLink
E. Relevant Project Experience <br />AZTEC has completed more than 700 projects for <br />numerous public agencies. As part of these efforts <br />we designated over 230 miles of underground <br />utilities and completed more than 60,000 potholes. <br />In California, AZTEC's SUE team members have <br />provided utility designating and potholing services <br />for Eastern Municipal Water District (EMWD), <br />Caltrans (multiple districts), Riverside County <br />Transportation Commission (RCTC),Orange <br />County Traffic Control (OCTC), Port of Long Beach <br />AZTEC's SUE core personnel have been with us <br />since the creation of the team in 2001. <br />AZTEC's team is presented in Figure 3 below and <br />identifies each team member's role on this contract, <br />applicable professional registrations and total years <br />of experience. <br />Figure 3: Team's Individual Professional <br />Registrations <br />Name <br />Project <br />PROWIFFM0 <br />arse <br />Role <br />Registrations <br />Experien <br />Carlos <br />Project <br />TX PE <br />18 <br />Tarazaga <br />Principal <br />#136631 <br />Art Mehler <br />Contract <br />N/A <br />35 <br />Manager <br />George <br />Project <br />N/A <br />14 <br />Enriquez <br />Manager <br />Steve <br />Survey <br />CA PLS <br />18 <br />Slocum, <br />Lead <br />#9044 <br />PLS <br />Robert <br />CADD <br />N/A <br />20 <br />Rappleyea <br />Technician <br />The following is an overview of projects completed <br />within the last five years that are most relevant to <br />the tasks by the City. <br />Caltrans District 7 <br />Contract #07A0462, On - <br />Call Roadway Design <br />and Related Project <br />W Development and <br />Construction Support, <br />Los Anaeles, CA <br />Description: Under this on -call for Caltrans District <br />7, AZTEC has provided on -call support, including <br />potholing, for task orders as assigned. Projects vary <br />from ADA improvement, Metal Guard Rail Beam <br />improvements, BMP improvements and pavement <br />improvement projects. AZTEC has assisted with <br />laying out all the potholes to maximize efficiency <br />while facilitating an operation that was completed <br />on time and within budget. <br />Year Completed: 2020 (Expected) <br />Client Name: Caltrans <br />Contact Name and Phone Number: William <br />Howard, 213.897.3017 <br />Riverside County Flood <br />Control District (RCFCD) <br />Utility Potholing On -Call, <br />Riverside, CA <br />Description: AZTEC <br />performed 35 potholes to expose existing utilities to <br />determine size, material of utility, depth and actual <br />location for the North Norco Channel Line project in <br />Norco, CA as part of the RCFCD as -needed Utility <br />Potholing On -Call. AZTEC provided personnel to <br />assist in laying out pothole locations. This close <br />cooperation with the client kept the project on <br />time and within the projected cost. We continue to <br />provide RCFCD with as -needed potholing services <br />under this contract. <br />Year Completed: Ongoing <br />Client Name: RCFCD <br />Contact Name and Phone Number: Ruby <br />Tabares, 951.955.0087 <br />French Valley Recycled <br />Water Pipeline Project, <br />Winchester, CA <br />Description: AZTEC <br />performed 30 potholes to <br />expose existing utilities to determine size, material <br />of utility, depth, and actual location. AZTEC also <br />assisted in the laying out of all potholes and utility <br />designating to maximize efficiency of work while <br />facilitating an operation that was completed on time <br />and within budget. <br />Year Completed: October 2016 <br />Client Name: EMWD <br />Contact Name and Phone Number: Cameron <br />Valenzuela, 951.928.3777 ext. 6107 <br />