Laserfiche WebLink
3. Assess traffic control as need for each pothole <br />location and determine if such needs would <br />require site specific traffic control plans that <br />cannot be covered under the latest MUTCD <br />Standards. Given the City's dense population <br />and high volume of traffic on arterial streets, <br />we anticipate that some task orders might <br />be required to be performed at night to <br />minimize traffic congestion. These scenarios <br />will be presented to the City during the permit <br />application process to avoid delays to the <br />project schedule. <br />4. Perform excavation of test holes after verifying <br />utility locations. <br />Figure 2-Test Hole Data Report <br />5. Collect all data. This includes, but is not limited <br />to, a photograph of the exposed utility, X, Y, <br />Z location data, size, type and material of <br />infrastructure found. Information concerning <br />pavement thicknesses and basic soil <br />information will also be noted. <br />6. Restore the work area as required under the <br />permit and mark the location with a permanent <br />marker such as a PK nail. <br />7. From the data collected, a report will be <br />generated containing all the information as well <br />as the surveyed coordinates with a benchmark <br />provided for reference. This report is then run <br />through a complete QA/QC process to ensure <br />the transmission of accurate information. An <br />example of Test Hole Data Report is shown as <br />Figure 2. <br />TEST HOLE DATA REPORT <br />Test role# a <br />SUE Crew O. Ennouez <br />Data Dug fl/14/21115 <br />�mJEC <br />Tmck# 377 <br />P ject# CAu1412 15510 <br />Pasadena Stree[untt C Lake Elsinore, CA 92530 Ctty Menttae <br />Phase# 001 <br />Tel.(951) 471619U Fax (951)4716194 <br />County Riverside <br />Location Menllee Lift Station <br />LOCATION PLAIN -NOT TO SCALE <br />D 1:1 <br />- <br />OC <br />W�1- <br />o <br />qe a <br />SITE BENCHMARK CROSSSECTION-NOTTOSCALE <br />FACING NCUT <br />wiTHRO 11 1 <br />TO T <br />F <br />o1EET1 <br />RIBBON COLOR Green <br />oToioM [L[vaTo <br />M <br />OEET) <br />COORDINATES'. NORTHING <br />ACTING <br />STATIONING . STATION <br />OFFSET <br />PAVINGTHICKNESS3" <br />PAVING Asphalt <br />SOILCONDITION DM <br />SIZE 10" TYPE <br />DIP FACurvOVNER <br />EMwDBVPass <br />COMMENTS <br />PREPARED BY A Mahler <br />CHECKED BY S. Estle <br />K <br />