Laserfiche WebLink
ROBERT <br />RAPPLEYEA <br />CADD Technician Lead <br />`BACKGROUND <br />Robert has 20 years of experience in producing <br />engineering drawings and CADD design. Mr. <br />Rappleyea as a Designer was responsible for the <br />grading and drainage/ earthwork calculations. He <br />designed paving, water and sewer plans. He is a CADD Technician is a member of the CADD standard <br />committee. He drafted all civil documents enduring accuracy and quality. He prepared the plan and <br />profile for water, sewer and paving plans. He designed grading cross sections and details.Mr. Rappleyea <br />completed construction noting for both phased and non -phased projects. <br />RELEVANT E�oFp��nir� <br />Caltrans District 7,11,12 - On -Call Project Management Servies Utility Locating Contracts, <br />Southern CA: CADD Designer. Robert supported CADD designs for these on -call contracts. <br />Chandler Boulevard and Kyrene Road Bike Lanes, Chandler, AZ ( City of Chandler): Robert was the <br />lead designer for this project which required the modification of existing raised medians and landscaping <br />to allow for the installation of bike lanes on both sides of the streets from the Loop 202 Freeway North <br />to the Chandler City limits where the bike lanes tied into the existing bike lanes within the City of Tempe. <br />The total project length was approximately 3 miles. <br />T2050 Cave Creek Road 26th St/Angela Drive -Marco Polo Road (City of Phoenix): Robert was <br />the senior designer for this project which addressed the existing infrastructure, lighting and landscape <br />deficiencies along Cave Creek Road and Contention Mine Road such as filling in gaps in the roadway <br />curb, gutter, sidewalk, addresseding non-ADA compliant sideway ramps and driveways. Traffic signal <br />upgrades were installed at Grovers Avenue and Union Hill Drive intersections. <br />Annual Engineering/Consulting Services Contract (2010-2011 & 2011-2012), Phoenix, AZ (City <br />of Phoenix): Lead CADD Designer for the right-of-way and design services for the 1-17 to North Valley <br />Parkway section of Sonoran Desert Drive. Responsibilities included estimating and documenting the full <br />right-of-way acquisition area required from State Land. Design evaluation included roadway modeling, <br />hydraulic evaluation of Skunk Creek and maintenance access requirements. In addition, full legal <br />descriptions and exhibits for the affected State Land Parcels were prepared. Robert is providing CADD <br />supportfor the second task assigned under this contract which includes providing services to complete <br />the 64th Street connection from SR101 L to Mayo Boulevard. Responsibilities for this task include <br />development of an interim embankment stockpile plan and updating the previously shelved 100% design <br />plans based on the interim condition and current geotechnical investigations. <br />Avenida Rio Salado/Broadway Road, Phoenix, AZ (City of Phoenix): CADD Design associated with <br />this City of Phoenix project. Responsible for the preparation of the Enhanced Project Assessment and <br />Environmental Documentation for the Avenida Rio Salado/ Broadway Road project located in Phoenix, <br />Arizona. <br />