Laserfiche WebLink
STEVE SLOCUM, <br />PLS <br />Survey Lead <br />`BACKGROUND <br />Mr. Slocum has 18 years of progressive <br />surveying experience. He has worked on several <br />significant projects, including recently serving <br />as Port of Long Beach on -call services Project <br />Manager. His project services include boundary and street monumentation, topographic data collection, <br />HDS ground based Lidar (laser scanning) surveys, aerial control and validation surveys, grading and <br />utility construction staking, control, and settlement and deformation monitoring verification. He is a former <br />president of the Orange County Chapter of California Land Surveyors Association. <br />RELEVANT EXPERIENCE <br />On -Call Professional Civil Engineering Services Port of Long Beach; Long Beach, CA (Long <br />Beach Port): Party Chief. Responsible for field surveys. Under an on -call, five-year contract, Steve <br />provided a variety of design and engineering services. The primary task orders have included: Task <br />order no. 1 - Pier D Water System Interconnect; Task order no. 2 - Pier C Sewer Abandonment Project; <br />Task order no. 3 - Matson Terminal Berth 60 Pavement Condition Investigation; Task order no. 4 - Trailer <br />Village PS&E; Task order no. 5 - Pier D Roadway Improvements; Task order no. 6 - Anaheim/ 1-710 <br />Health and Safety Services; Task order no. 7 - Middle Harbor Pavement Analysis and Report; and Task <br />order no. 8 - Interim Headquarters Tenant Improvements 4801 Airport Plaza Drive. <br />Metro Gold Line Intermodal Parking Facilities and Enhancements; Arcadia, Duarte, Irwindale, and <br />Azusa, CA (Metro Gold Line Foothills Construction Authority): Party Chief. Responsible for field <br />surveys. Steve provided professional services for the Metro Gold Line Authority's Intermodal Parking <br />Facilities and Enhancements Design -Build Project. The project involved six transit station sites, four of <br />which will include the design of structured parking, located within the cities of Arcadia, Monrovia, Duarte, <br />Irwindale and Azusa. <br />Sewer Master Plan and Capital Improvement Program; Long Beach, CA (Port of Long Beach): <br />Party Chief. Responsible for field surveys. Steve provided engineering services to the Port of Long Beach <br />for its sewer master plan and capital improvement program within the Harbor District. Services included <br />developing and analyzing a hydraulic model of the sewer system, updating the GIS, performing closed <br />circuit television (CCTV) inspection of 24 miles of pipeline, performing a condition assessment of 449 <br />manholes and 40 lift stations, performing a flow monitoring and inflow and infiltration (0) study, and <br />preparing a sewer master plan and capital improvement program. <br />Western Regional Trunk Sewer Rehabilitation; Orange County, CA (Orange County Sanitation <br />District): Survey Manager. Responsible for land survey field crews. Steve provided engineering design <br />services for the rehabilitation of four sewer reaches and one pump station in Anaheim, Long Beach, Seal <br />Beach, Cypress, Buena Park, and Los Alamitos; a total of 84,000 linear feet of sewer line. <br />I N T E R N A T 1 0 N A L <br />