Laserfiche WebLink
BELOW <br />SUBSURFACE IMAGING <br />CHRIS LOERA <br />PROJECT MANAGER/CHIEF <br />EXECUTIVE OPFICFR <br />YEARS OF EXPERIENC'.E <br />14280 Euclid Ave <br />Chino, CA 91710 <br />1-888-90-BELOW <br />Certified SBE <br />1.0 FIRM & TEAM EXPERIENCE <br />Chris Loera has over 16 years of experience in the construction <br />industry. He maintains a hands-on approach by researching and <br />attending industry workshops. He meets with the equipment <br />manufactures to stay up to speed on the new technologies available. <br />He plans, organizes, directs and controls the activities of the Operations <br />function of the division. Responsible for the performance of all <br />Departments including Research and Development, Material <br />Management, Order Services, Engineering and Surveying. <br />CITY OF CORONA DEPARTMENT OF WATER AND POWER CORONA, CA <br />ROLE: CHIEF OPERATING OFFICER/ PROJECT MANAGER <br />Since 2014 C Below has had an on -call contract with the City of Corona <br />to provide utility locating, mapping, and potholing services. Mr. Loera <br />supervises all operations to ensure the projects are scheduled in a <br />timely manner and the client receives the information needed. <br />16 PORT OF LONG REACH ON -CALL <br />ROLE: CHIEF OPERATING OFFICER/ PROJECT MANAGER <br />Supervised all operations to assure they were conducted and <br />EDUCATION completed as directed by the POLE. Services included: Utility locating <br />East LA Skills Center- Construction via GPR, Electromagnetic locating, ram rod locating, potholing via <br />Inspection vacuum excavation, and Surveying/CAD work, CCTV Pipe Inspection. <br />REGISTRATIONS/ CERTIFICATIONS <br />LADWP PIPELINE PROJECTS LOS ANGELES, CA <br />Ground Penetrating Radar Technician <br />ROLE: CHIEF OPERATING OFFICER/ PROJECT MANAGER <br />C Below has completed well over twenty projects for the Los Angeles <br />I. evel III <br />Department of Water and Power, Mr. Loera oversees all operations of <br />Technician Locator Level III <br />utility investigation and potholing. Most of the sites involve utility mark <br />out and mapping of over 5,000 linear feet from curb to curb. Services <br />included: utility locating via GPR and Electromagnetic locating, site <br />PROGRAM MANAGIFMENI" <br />surveying, and CAD work, coordination with the client is key in orderto <br />Auto CAD 201 D-2013 <br />schedule the work at the most appropriate time due to high traffic <br />Auto CAD <br />volume. Careful planning ahead of time and communicating with <br />Operations and Dispatch allows for successfully completing the <br />Civil 3D <br />projects on schedule. <br />Solid Works 31) <br />Micro Station <br />ORANGE COUNTY PUBLIC WORKS SANTA ANA, CA <br />ROLE: CHIEF OPERATING OFFICER/ PROJECT MANAGER <br />InRoads Suite <br />C Below currently has a Master Service Agreement with Orange <br />Service CEO <br />County Public Works, this helps streamline the process from <br />request of quote to scheduling, Mr. Loera supervises all <br />operations to ensure they are conducted as directed by OCPW. <br />Services include: utility locating via electromagnetic locating, <br />GPR, ram rod locating, and potholing via vacuum excavation. <br />RFP No. 20-060 Subsurface Utility Engineering Services <br />www.cbelow.com Page 5 <br />25D-87 <br />