My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2020-09-15
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
09/15/2020
>
FULL PACKET_2020-09-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 9:04:01 AM
Creation date
9/14/2020 8:46:47 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
9/15/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
585
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
v <br />/0 BELOW <br />SUBSURFACE IMAGING <br />HECTOR VARGAS <br />PROJECT MANAGER <br />YEARS OF EXPERIENCE <br />7 <br />14280 Euclid Ave <br />Chino, CA 91710 <br />1-888-90-BELOW <br />1.0 FIRM & TEM EXPERIENCE <br />Mr. Vargas has over 10 years of experience in the construction industry <br />7 of which he has dedicated to the utility locating industry. He has <br />worked as a sales representative, a project manager and a lead <br />supervisor. These different roles have given him a well-rounded <br />knowledge of the industry from project inception to project <br />completion. He can step in and help our Lead Surveyor and Field <br />Manager with daily requests and large project needs. He oversees the <br />coordination of all office and field efforts within the project limits to <br />ensure the highest standards for utility location accuracy. <br />SR-55 WIDENING PROJECT <br />ROLE: PROJECT MANAGER <br />Oversaw all field efforts when performing the 155 potholes. <br />Responsible for coordinating with the client and the technicians. <br />Managingthe project budget, pulling permits, and reviewing technician <br />findings. Completed 2019 <br />PLACENTIA SEWER RELOCATION POTHOLING <br />REGISRATIONSf CERTIFICATIONS ROLE: PROJECT MANAGER <br />Ground Penetrating Radar Technician Oversaw all field efforts, responsible for coordinating with the client <br />Level III and the technicians. Managing the project budget, pulling necessary <br />Utility Locator Technician Level III permits, and reviewingthe findings priortosending outthe final report <br />to the client. Completed 2018 <br />489 E. ST LATERAL LOCATE AND MANHOLE DIPS <br />ROLE: PROJECT MANAGER <br />Oversaw all field operations, including coordinating with the client and <br />the technicians, managing the project budget, and reviewing the <br />technicians daily report. Completed 2018 <br />JEFFREY POTHOLING INVESTIGATION <br />ROLE: PROJECT MANAGER <br />C Below performed 57 potholes and Mr. Vargas was responsible for <br />overseeing all permitting, traffic control, and communicating with the <br />client and technicians. Completed 2018 <br />SAN CARLOS STREET SEWER POTHOLING <br />ROLE: PROJECT MANAGER <br />Oversaw all field operations including coordinating with the client and <br />technicians, pulling permits, and reviewing the teens final report. <br />Completed 2018 <br />REP No. 20-060 Subsurface Utility Engineering Services <br />wwwcbelow.com Page 6 <br />r :: <br />
The URL can be used to link to this page
Your browser does not support the video tag.