My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
JPW COMMUNICATIONS, LLC.
Clerk
>
Contracts / Agreements
>
J
>
JPW COMMUNICATIONS, LLC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2024 11:52:56 AM
Creation date
9/14/2020 4:03:20 PM
Metadata
Fields
Template:
Contracts
Company Name
JPW COMMUNICATIONS, LLC.
Contract #
A-2020-158-16
Agency
City Manager's Office
Council Approval Date
8/4/2020
Expiration Date
12/31/2020
Insurance Exp Date
1/1/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposed Scope of Work (continued) <br />PHASE FOUR I IMPLEMENTATION <br />JPW Communications will implement as much or as little of the plan as needed by the City of Santa Ana. Pricing has been provided <br />for items already confirmed. Additional implementation costs can be provided as needed once the plan is completed. <br />• Key Deliverables: Comprehensive resource guide (16-page, 8.5" x 11" self -cover, full -color magazine); door hanger (jumbo, <br />doubled -sided, 5.25" x 8.5"); bus shelter advertising (sizing to be determined); banner design (sizing to be determined); <br />ambassador card (3.5" x 2"); and social media templates (Instagram, Facebook, Twitter). <br />PHASE FIVE I EVALUATION <br />Project metrics will be reviewed against original goals and objectives to ensure targets are met and to determine effectiveness <br />and any course correction needs. JPW views evaluation as an ongoing process conducted throughout every step of our <br />engagement, notjust at the conclusion of a project. <br />• Key Deliverable: A full set of output and outcome metrics will be included in the comprehensive outreach plan. JPW will <br />also measure those metrics at the conclusion of the campaign to determine whether or not operational and campaign <br />objectives were met <br />Proposed Scope of Work I City of Santa Ana Proposal <br />JPWCOMMUNICATIONS <br />LLFROM GOVERNMENT FOR GOVERNMENT <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.