Laserfiche WebLink
DBA No. 2020-01/SPR No. 2020-01/SPR No. 2020-02/VAR No. 2020-05/TPM No. 2020-02 <br />Third & Broadway Mixed -Use Development <br />September 28, 2020 <br />Page 11 <br />Tentative Parcel Map <br />Subdivision requests are governed by Chapter 34 and Chapter 41 of the SAMC. Pursuant to Section <br />66473.5 and 66474 of the California Subdivision Map Act, applications for tentative parcel maps are <br />approved when it can be shown that findings can be made in support of the request. Specifically, <br />findings related to the proposal must be made to show consistency with the General Plan, <br />conformance to all applicable City ordinances, the project site being physically suitable for the type <br />and density of the proposed project, the proposed project not causing substantial environmental <br />damage or substantially and avoidably injure fish and wildlife or their habitat, not causing serious <br />public health problems, or not conflicting with easements necessary for public access through or use <br />of the property. <br />The applicant is seeking approval of a tentative parcel map for condominium purposes to subdivide <br />the 1.41-acre parcel into two parcels, create three airspace parcels and to provide public and <br />emergency vehicle access to a private street and sidewalks (Exhibit 13). The subdivision is not to <br />create residential condominium units for sale and ownership. The airspace parcels that are being <br />created are referred to as condominium units and allow the parcels to have separate interests. The <br />two parcels include Parcel 1 (the mixed -use residential building) and Parcel 2 (the hotel <br />building). Parcels A, B, and C represent airspace parcels (set horizontal and vertical limits) of the <br />parking areas within the structure for separate interests. The building and common areas will be <br />managed by Covenants, Conditions and Restrictions (CC&Rs). In reviewing the project, staff <br />determined that the proposal as conditioned is consistent with the various provisions of the SAMC <br />and General Plan, including lot size and lot frontage. No adverse environmental impacts to fish or <br />wildlife populations were identified as the project site is located in a built -out, urbanized area. Finally, <br />the tentative map was found to be consistent with the California Subdivision Map Act and Chapters <br />34 and 41 of the Municipal Code. <br />California Environmental Quality Act (CEQA) <br />An addendum to a previously certified EIR is prepared when a lead agency is asked to approve <br />modifications to an existing project for which an EIR has already been certified. An addendum <br />evaluates the requested modifications and determines whether subsequent EIR review is required. <br />Since none of the conditions specified in State CEQA Guidelines, section 15162 are present, an <br />Addendum to the previously -certified 2010 EIR was prepared for the Third and Broadway project. <br />Pursuant to State CEQA Guidelines section 15164(b), an addendum to a previously -certified EIR <br />is not circulated for public review. The Addendum is included with this staff report as Exhibit 14. <br />Pursuant to State CEQA Guidelines section 15164(d), the Planning Commission must consider <br />the Addendum together with the TZC's original 2010 EIR before making a decision on the project. <br />Previous CEQA Documentation <br />The 2010 TZC EIR (SCH No. 2006071100) anticipated potential development of approximately <br />4,075 residential units, 387,000 square feet of retail development, and an additional 15.5 acres of <br />open space within the City. The 2010 EIR considered the environmental impacts related to <br />75A-53 <br />