My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH 2019-85
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
10/20/2020
>
75A - PH 2019-85
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2020 4:52:21 PM
Creation date
10/15/2020 4:42:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75A
Date
10/20/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DBA No. 2020-01/SPR No. 2020-01/SPR No <br />Third & Broadway Mixed -Use Development <br />September 28, 2020 <br />Page 12 <br />2020-02NAR No. 2020-05/TPM No. 2020-02 <br />aesthetics; air quality; biological resources; cultural resources; hazards and hazardous materials; <br />hydrology and water quality; land use; noise; population, housing, and employment; public <br />services; transportation and traffic; utilities and service systems; and climate change. A mitigation <br />monitoring and reporting program, findings of fact, and a statement of overriding consideration <br />were adopted with the 2010 EIR. <br />2020 Third and Broadway Addendum <br />The Addendum focuses on the potential environmental impacts associated with the project, <br />including the density bonus application and associated concessions and waivers, site plan review <br />applications, variance, tentative parcel map and disposition and development agreement that might <br />cause a change in the conclusions of the certified 2010 EIR, including changes in circumstances <br />or new information of substantial importance that would substantially change those conclusions. <br />The proposed development required preparation of studies relating to shade and shadow, air quality <br />and greenhouse gas emissions, traffic, parking, noise and vibration, Phase I environmental site <br />assessment, hydrology, a preliminary water quality management plan, and sewer capacity <br />(Attachments to the 2020 Addendum). All studies evaluate the proposed project as compared to the <br />existing entitlements and were reviewed for content and accuracy by the City. In addition, the project <br />is within a Transit Priority Area. Under Senate Bill 743, aesthetic and parking impacts cannot be <br />considered a significant impact within a Transit Priority Area. <br />The addendum concludes no new or substantially greater impacts would occur with <br />implementation of the proposed development when compared to those identified in the 2010 EIR <br />and finds that no supplemental or subsequent EIR is required for the proposed development. <br />Therefore, the 2010 EIR's MMRP will continue to mitigate or lessen any impacts already identified <br />by the TZC's original 2010 EIR. <br />Economic Development <br />The Community Development Agency in coordination with Kosmont Companies estimates <br />approximately 510 local construction jobs and $53,000,000 in local labor income will be generated in <br />the short-term, and $737,000 in annual general fund revenue will be generated for the long-term. <br />Table 7: Estimated General Fund Revenue from Proposed Project <br />Summary of Annual Estimated Revenue from Project <br />Property Tax Secured & Unsecured) <br />$210,000 <br />Property Tax In -Lieu of VLF <br />$130,000 <br />Sales & Use Tax On-Site/Direct <br />$57,000 <br />Sales & Use Tax Off-Site/Indirect <br />$25,000 <br />Transient Occupanc Tax $90 RevPar <br />$270,000 <br />Utility User Tax & Other Tax <br />$45,000 <br />Annual General Fund Revenues (ROUNDED): <br />$737,000 <br />75A-54 <br />
The URL can be used to link to this page
Your browser does not support the video tag.