My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CWE
Clerk
>
Contracts / Agreements
>
C
>
CWE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2022 5:32:07 PM
Creation date
10/28/2020 1:59:49 PM
Metadata
Fields
Template:
Contracts
Company Name
CWE
Contract #
A-2020-205-02
Council Approval Date
10/20/2020
Expiration Date
10/19/2023
Insurance Exp Date
12/1/2022
Destruction Year
2028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�, City of Santa Ana <br />U`_'4 On -Call Stormwater Project Design Services RFP No.: 20-102 <br />Task <br />Oversee construction on behalf of the City <br />Construction management <br />Prepare reports, conduct monitoring, summarize data, <br />Post -project support <br />develop as-builts, and assess effectiveness following <br />completion in accordance with grants or other <br />programs <br />Grant Administration Support <br />Prepare applications and supporting documents to <br />Develop grant applications " <br />assist the City in obtaining funds for multi -benefit <br />projects <br />Develop Monitoring and Reporting Plans, Quality <br />Develop plans and reports <br />Assurance Program Plans, quarterly/final reports, etc. <br />as needed based on the grant <br />agreement/requirements <br />Develop tracking templates in coordination with City <br />Track grant opportunities <br />goals and objectives to position in advance for <br />opportunities <br />Create presentations and informational materials for <br />Presentations <br />the City to use in coordination with grant/funding <br />opportunities <br />Relevant Project Experience <br />City of Culver City Washington Boulevard P3 <br />Urban Runoff Diversion <br />CWE is designing the region's first Public Private <br />Partnership (P3) project for stormwater purposes. This <br />P3 project with Costco includes a diversion system to <br />capture stormwater and urban runoff from a drainage <br />area of approximately 40 acres for the City of Culver <br />City. The project is located on Washington Boulevard <br />near Walnut Avenue at the City boundary. The drainage <br />area is comprised of commercial and residential land <br />uses completely within the City boundaries. The system is expected to capture approximately <br />122,000 cubic feet of stormwater runoff. Tasks include: developing project concepts for <br />diversion and bio-filtration systems; conducting an environmental study; performing hydrologic <br />and hydraulic analyses; coordinating with the City of Los Angeles and Los Angeles County <br />Department of Public Works (LACDPW); topographic survey; conducting a utility search for the <br />project site to identify existing or planned future utility conflicts along the proposed project <br />components; preparing Plans, Specifications, and Estimates (PS&E); providing community <br />outreach support; and construction support. Contact: Kim Braun, Project Manager, <br />(310) 253-6421, kim.braun@culvercity.org <br />-16- <br />r� <br />CW= <br />
The URL can be used to link to this page
Your browser does not support the video tag.