report for a proposed 3.6-acre park in San Juan
<br />Capistrano, California. The new park will include a cultural
<br />area, multi -use trail, and various artwork and amenities.
<br />Stantec provided surveying and engineering services,
<br />including grading, utilities, drainage, and traffic plans as a
<br />subcontractor to landscape architecture firm NUVIS.
<br />East Garden Grove-Wintersburg Channel and
<br />Fullerton Creek Channel, Orange County, CA
<br />Phil provided HEC RAS floodplain analysis for the East
<br />Garden Grove- Wintersburg Channel and Fullerton Creek
<br />Channel, as part of Orange County Flood Control District's
<br />FEMA Hazard Mitigation Grant Application.
<br />Carbon Creek Channel Facility Study Needs
<br />Assessment, Brea, CA
<br />Phil prepared a study to establish the scope of work for a
<br />preliminary design report for the Carbon Creek Channel
<br />facility.
<br />1.710 Corridor Improvement Project, Long Beach, CA
<br />Phil reviewed and provided comments on hydrology
<br />and drainage issues for the proposed 1-710 corridor
<br />improvement project, as part of the Environmental Impact
<br />Report assistance required by the City of Long Beach
<br />Environmental Planning Program. Stantec also reviewed
<br />and commented on water quality, active transportation,
<br />and community enhancement elements as a subcontractor
<br />to Michael Baker International.
<br />Montalvo Canyon Drainage Study, San Clemente, CA
<br />Phil provided HEC RAS analysis for proposed channel
<br />improvements near the outlet of Montalvo Creek at the
<br />Pacific Ocean. As a subcontractor to FluvialTech Inc.,
<br />Stantec provided civil engineering services, including cost
<br />estimating; boundary survey; preparation of PS&Es for
<br />bank establishment and channel restoration; bid package;
<br />coordination and meetings; and engineering support
<br />during construction.
<br />Planning Area 39, Phase 2B - Los Olivos, Irvine, CA
<br />Phil provided drainage management services, including
<br />sediment yield, water quality design capture volume,
<br />and a hydrology report for a mixed -use community. The
<br />project is part of Stantec's construction support services
<br />for improvements to the tentative parcel map, street, and
<br />utility infrastructure.
<br />Eland 1 Solar Farm (2018), California City, CA
<br />Stantec provided peer review of archaeology and historical
<br />assessment to evaluate potential impacts on cultural
<br />resources at a solar farm in California City, California. Phil
<br />provided a preliminary hydrology and drainage study for
<br />an addendum to the final Environmental Impact Report.
<br />2530 Arden Way, Sacramento, California
<br />Phil provided HEC RAS floodplain analysis of Strong
<br />Ranch Slough as part of proposed improvements at 2530
<br />Arden Way in Sacramento, California.
<br />Laguna Audubon Retarding Basin Improvement (2018
<br />— Ongoing), Laguna Beach, CA
<br />Phil provided preparation of technical specifications and
<br />special provisions, as part of final engineering services
<br />for the Laguna Audubon Retarding Basin. The tributary
<br />watershed area is approximately 706 acres and lies within
<br />the cities of Laguna Beach, Laguna Woods, and Aliso
<br />Viejo. Stantec previously prepared a study to evaluate
<br />the basin's current performance for the 2-, 5-,10-, 25-,
<br />and 100-year expected value storm events and determine
<br />if additional improvements to the basin could further
<br />enhance its effectiveness. The study recommended three
<br />alternatives in providing the basin with the prescribed
<br />2-feet of freeboard above the Probable Maximum Flood
<br />(PMF) water surface. The client selected to construct a
<br />perimeter floodwall along the earthen basin crest and the
<br />extension of existing concrete outlet channel walls to be
<br />implemented.
<br />Orange County Public Works Operations and
<br />Maintenance Division*, Orange County, CA
<br />Phil managed the ongoing maintenance and operations
<br />of regional dams, pump stations, and water diversion
<br />facilities where he oversaw maintenance supervisors
<br />in charge of the County Worker and Court Referral
<br />Programs, fabricators and installers, welders, and
<br />carpenters in the Special Trades Section for County road
<br />signs.
<br />Orange County Public Works Design Division*,
<br />Orange County, CA
<br />Phil managed the engineers, project managers, design
<br />engineers, and engineering technicians/draftsmen
<br />employed in the OC Public Works Design Division.
<br />Division responsibilities included developing technical
<br />engineering studies and construction plans, specifications,
<br />estimates, and construction documents for regional and
<br />local infrastructure projects. During disasters and heavy
<br />storm activity, Phil led a team of storm patrol leaders and
<br />emergency workers.
<br />* Denotes projects completed with other firms
<br />Stantec - Proposal for On -Call Stormwaler Project Design Services
<br />
|